KELOWNA, BC, March 17, 2020 /CNW/ - Cantex Mine Development Corp. (CD: TSXV) (the "Company") has released an update on the work program at its Massive Sulphide project within its 100-per-cent-owned 14,077 hectare North Rackla claim block where drill results continue to define a silver-lead-zinc mineralized system with Broken Hill Type (BHT) affinities.
All of the 2019 drill results have now been received from the Massive Sulphide project
Additional results have been received from drilling at pads MZ31, MZ32, MZ33, MZ34 and MZ39B within the Main Zone
Highlights include a true width of 6.62 metres of 119.17 g/t silver, 8.77% lead and 10.68% zinc was intersected from 275.70 to 284.10 metres in hole YKDD19-125
Results continue to confirm the presence of a large-scale mineralizing system within a marine sedimentary sequence of Proterozoic age
RESULTS
Additional assays have been received from some of the holes presented in the Company's January 30, 2020 release. These results, from eight holes drilled off pads MZ31, 32, 33, 34 and 39B, show additional silver-lead-zinc mineralization in this area. These new results are italicized within Table 1. Collar locations are presented in Figure 1.
Table 1. Additional drill results from previously released Main Zone holes
Pad
Dip
Hole
From
(m)
To
(m)
Length
(m)
True
Width
(m)
Silver
(g/t)
Lead +
Zinc
(5%)
Lead
(%)
Zinc
(%)
Copper
(%)
Mn
(%)
MZ 39B
-71
YKDD19-121
12.20
13.50
1.30
0.71
8.97
10.17
2.51
7.66
0.02
2.51
29.10
47.00
17.90
9.75
3.96
3.04
0.83
2.21
0.00
1.03
50.30
51.80
1.50
0.82
3.14
2.16
0.41
1.75
0.03
3.55
82.80
84.70
1.90
1.03
51.50
0.02
0.00
0.02
1.98
2.59
MZ 31
-70
YKDD19-152
213.50
214.00
0.50
0.23
33.50
9.59
6.02
3.57
0.07
2.73
220.70
221.85
1.15
0.52
2.07
2.60
0.13
2.47
0.00
3.23
Pad
Dip
Hole
From
(m)
To
(m)
Length
(m)
True
Width
(m)
Silver
(g/t)
Lead +
Zinc
(%)
Lead
(%)
Zinc
(%)
Copper
(%)
Mn
(%)
MZ 34
-45
YKDD19-153
144.10
146.45
2.35
2.09
1.64
2.28
0.07
2.21
0.01
0.31
171.00
171.50
0.50
0.45
3.16
3.25
0.87
2.38
0.01
0.73
186.50
188.70
2.20
1.96
23.92
5.85
4.11
1.74
0.07
0.78
210.90
214.10
3.20
2.85
166.47
4.37
0.71
3.66
1.98
2.69
227.15
227.95
0.80
0.71
1.12
3.44
0.08
3.36
0.01
0.38
229.15
230.00
0.85
0.76
1.73
2.69
0.02
2.67
0.00
0.26
233.40
234.40
1.00
0.89
60.40
12.59
4.94
7.65
0.32
1.43
237.15
238.00
0.85
0.76
0.59
3.01
0.01
3.00
0.01
0.20
240.10
241.60
1.50
1.34
0.61
1.41
0.04
1.37
0.00
0.36
300.25
303.00
2.75
2.45
5.24
4.86
1.05
3.81
0.01
0.18
-62
YKDD19-156
189.60
191.00
1.40
1.06
1.80
1.25
0.10
1.15
0.01
0.25
233.45
234.05
0.60
0.45
3.75
3.34
0.10
3.24
0.01
0.30
270.65
287.50
16.85
12.72
44.70
10.67
3.20
7.47
0.08
4.10
Including
272.80
283.50
10.70
8.08
62.58
15.83
4.90
10.93
0.06
5.02
333.85
334.50
0.65
0.49
1.43
2.53
0.30
2.23
0.01
0.33
339.75
340.35
0.60
0.45
13.50
2.68
0.91
1.77
0.13
2.10
MZ 33
-62
YKDD19-146
186.60
188.30
1.70
1.18
12.71
10.40
1.57
8.83
0.02
2.05
218.80
220.20
1.40
0.97
0.80
1.34
0.08
1.26
0.00
0.64
222.60
240.75
18.15
12.61
95.62
33.82
13.21
20.61
0.07
2.23
351.00
352.55
1.55
1.08
137.10
26.12
21.32
4.80
0.35
1.65
360.60
361.55
0.95
0.66
24.50
7.45
1.65
5.80
0.21
2.33
392.20
392.70
0.50
0.35
7.17
3.23
0.23
3.00
0.03
1.12
412.25
413.60
1.35
0.94
53.79
4.75
2.73
2.02
0.53
4.64
452.25
453.00
0.75
0.52
1.11
1.45
0.14
1.31
0.00
0.22
MZ 32
-62
YKDD19-107
146.80
147.80
1.00
0.64
7.31
4.68
0.38
4.30
0.10
2.01
179.60
180.60
1.00
0.64
3.51
1.94
0.10
1.84
0.07
3.07
181.10
182.50
1.40
0.90
22.46
15.92
0.76
15.16
0.10
3.07
266.80
267.40
0.60
0.39
0.74
1.63
0.01
1.62
0.00
0.27
408.90
413.40
4.50
2.89
8.88
8.44
0.27
8.17
0.02
0.30
-70
YKDD19-112
171.00
173.00
2.00
1.06
5.10
2.71
0.25
2.46
0.03
0.50
220.70
222.50
1.80
0.95
2.11
5.32
0.01
5.31
0.01
4.57
224.90
226.00
1.10
0.58
9.03
2.32
0.78
1.54
0.04
1.65
248.50
252.30
3.80
2.05
7.58
5.84
0.03
5.81
0.01
1.13
253.30
254.40
1.10
0.58
4.52
4.29
0.01
4.28
0.01
0.39
326.00
326.60
0.60
0.32
10.95
2.00
0.91
1.09
0.07
0.95
467.40
468.40
1.00
0.54
2.08
1.16
0.16
1.00
0.01
0.53
487.80
488.80
1.00
0.54
11.05
1.49
0.15
1.34
0.07
2.02
493.60
494.20
0.60
0.33
318.00
1.62
0.36
1.26
1.55
1.86
506.00
506.60
0.60
0.33
52.20
17.83
17.10
0.73
0.08
2.42
-80
YKDD19-117
104.00
105.50
1.50
0.56
5.01
2.76
0.34
2.42
0.01
0.09
308.10
318.00
9.90
3.71
5.59
2.36
0.04
2.32
0.08
3.08
Including
316.00
317.00
1.00
0.37
4.27
11.79
0.04
11.75
0.05
2.73
324.00
325.00
1.00
0.37
1.29
2.02
0.04
1.98
0.01
4.61
348.00
350.00
2.00
0.75
3.26
1.83
0.00
1.83
0.00
2.32
Drill results from 39 holes drilled at sixteen drill pads on the Main Zone have now been received. Drilling from pad MZ 5X continued to intercept mineralization to depth below pad MZ 5. A true width of 6.62 metres of 119.17 g/t silver, 8.77% lead and 10.68% zinc was intersected in hole YKDD19-125 starting at 275.70 metres. No significant results were intersected in drilling from pads MZ14, MZ16B, MZ48, MZ-3 and MZ-5. Results from these holes are presented in Table 2.
Table 2. Main Zone drill results
Pad
Dip
Hole
From
To
Length
True
Silver
Lead +
Lead
Zinc
Copper
Mn
Width
Zinc
(m)
(m)
(m)
(m)
(g/t)
(%)
(%)
(%)
(%)
(%)
MZ 1
-45
YKDD19-089
No significant results ("NSR")
-62
YKDD19-092
NSR
-70
YKDD19-094
NSR
-80
YKDD19-095
175.40
176.30
0.90
0.51
18.20
1.87
1.85
0.02
0.00
3.74
177.90
181.00
3.10
1.78
90.34
0.25
0.07
0.18
0.10
2.82
186.40
188.50
2.10
1.20
51.03
0.25
0.15
0.10
0.11
2.51
MZ 2
-45
YKDD19-075
NSR
-62
YKDD19-079
YKDD19-084
NSR
-70
YKDD19-084
NSR
-80
YKDD19-085
137.30
138.50
1.20
0.71
177.00
1.32
0.52
0.80
1.01
2.02
141.30
145.60
4.30
2.53
55.73
6.11
5.81
0.30
0.07
3.00
-89
YKDD19-088
199.10
200.00
0.90
0.31
574.00
5.69
5.40
0.29
0.83
2.66
202.00
203.60
1.60
0.55
13.90
1.94
1.92
0.02
0.01
2.98
213.30
213.90
0.60
0.21
25.00
1.36
1.31
0.05
0.03
2.48
221.60
222.60
1.00
0.34
26.50
3.21
3.16
0.05
0.01
3.88
227.00
231.30
4.30
1.47
166.94
3.61
3.02
0.59
0.38
2.96
MZ 15
-45
YKDD19-120
116.00
117.00
1.00
0.84
2.09
1.24
0.06
1.19
0.00
1.01
MZ 16
-45
YKDD19-097
110.40
111.50
1.10
0.93
4.05
1.32
0.18
1.14
0.00
1.91
-62
YKDD19-100
NSR
-70
YKDD19-102
NSR
-80
YKDD19-104
NSR
MZ 29
-45
YKDD19-145
112.75
115.05
2.30
1.97
3.35
2.31
1.24
1.07
0.01
5.06
-62
YKDD19-147
NSR
-70
YKDD19-150
190.40
191.20
0.80
0.45
41.00
0.36
0.12
0.24
1.78
2.42
203.75
204.60
0.85
0.48
6.21
1.88
1.85
0.04
0.00
4.11
237.90
239.50
1.60
0.89
52.75
2.17
0.33
1.84
0.78
2.83
MZ 36C
-50
YKDD19-136
174.60
176.00
1.40
1.13
7.50
0.54
0.10
0.44
0.93
0.48
MZ 37B
-45
YKDD19-140
NSR
-62
YKDD19-141
138.70
139.60
0.90
0.45
0.84
1.29
0.04
1.26
0.00
0.18
156.30
156.80
0.50
0.25
0.79
1.61
0.08
1.53
0.00
0.25
MZ 38C
-45
YKDD19-133
NSR
-65
YKDD19-137
47.80
48.30
0.50
0.86
5.50
1.96
0.31
1.65
0.09
0.49
Pad
Dip
Hole
From
To
Length
True
Silver
Lead +
Lead
Zinc
Copper
Mn
Width
Zinc
(m)
(m)
(m)
(m)
(g/t)
(%)
(%)
(%)
(%)
(%)
MZ 43
-45
YKDD19-135
NSR
-70
YKDD19-138
94.10
94.70
0.60
0.27
4.44
2.36
0.09
2.27
0.00
0.52
126.80
128.00
1.20
0.54
18.90
1.63
0.41
1.22
0.04
0.75
171.90
172.50
0.60
0.27
10.40
6.80
1.45
5.35
0.01
0.25
180.00
181.80
1.80
0.82
20.52
2.18
0.63
1.55
0.05
0.81
MZ 43B
-45
YKDD19-142
250.00
250.85
0.85
0.65
3.49
1.27
0.20
1.08
0.02
0.34
MZ 5X
-47
YKDD19-125
270.00
271.00
1.00
0.79
30.60
7.20
4.36
2.84
0.01
3.88
275.70
284.10
8.40
6.62
119.17
19.45
8.77
10.68
0.07
2.33
307.90
308.60
0.70
0.55
103.00
32.15
15.75
16.4
0.06
0.82
323.60
324.30
0.70
0.55
45.30
6.56
1.13
5.43
0.01
0.29
325.60
326.30
0.70
0.55
8.98
2.86
0.73
2.13
0.00
0.18
-65
YKDD19-127
360.90
362.20
1.30
0.80
17.35
3.52
1.13
2.39
0.00
4.52
367.50
374.10
6.60
4.06
41.28
9.45
4.71
4.74
0.01
4.64
Including
370.80
372.00
1.20
0.74
136.32
23.15
12.19
10.96
0.03
3.15
-71
YKDD19-131
NSR
-74
YKDD19-134
NSR
-71
YKDD19-139
416.00
418.10
2.10
1.41
12.67
4.94
4.28
0.66
0.00
2.95
Figures 2, 3, 4 show sections through pads MZ5X, MZ33 and MZ34 respectively.
Seven holes were drilled from 3 pads at the South Zone. Although high zinc values were found in grab samples collected at surface (see release dated September 10, 2019) the drilling did not intersect significant mineralization. Additional sampling and mapping will be completed to assist in future drill testing of this zone.
The drill holes reported in this press release were drilled using HQ (63.5mm) diamond drill bits. The core was logged, marked up for sampling and then divided into equal halves using a diamond saw on site. One half of the core was left in the original core box. The other half was sampled and placed into sealed bags which were in turn placed into larger bags closed with security seals prior to being transported to CF Mineral Research Ltd in Kelowna, BC.
At CF Minerals the samples were dried prior to crushing to -10 mesh. The samples, which averaged over 3kg, were then mixed prior to splitting off 800 to 1,000g. The 800g splits were pulverized to -200 mesh and a 250g split was sent for assay. Quality control procedures included the insertion of coarse quartz samples to assess the sample preparation. Silica blanks were inserted along with certified reference samples. These quality control samples were each inserted approximately every 20 samples.
ALS Chemex in Vancouver assayed the samples using a four-acid digestion with an ICP-MS finish. The 48 element ME-MS61 technique was used to provide a geochemical signature of the mineralization. Where lead or zinc values exceeded one percent the Pb-OG62 or Zn-OG62 techniques were used. These have upper limits of 20% lead and 30% zinc respectively. Samples with lead and zinc values over these limits are then analyzed by titration methods Pb-VOL70 and Zn-VOL50. The over limit analyses (and the over limit – over limit analyses) contribute to delays in receiving final assay results.
DISCUSSION
Drill results continue to demonstrate the extensive trend of the Main Zone high-grade silver-lead-zinc mineralization at the Company's Massive Sulphide project, which is believed to be of sedimentary exhalative (sedex) origin. Mineralization is coarsely crystalline and appears to be stratabound, showing evidence of recrystallization during mild metamorphism. Based on a combination of multiple factors (the nature of the sedimentary host sequence, the Proterozoic age, the elevated manganese levels, and the high silver content), the North Rackla mineralization is believed to belong to the BHT (Broken Hill type) sub-class of sedex silver-lead-zinc deposits. The Broken Hill massive sulphide deposit is also locally displaced by faulting and folding, has been mined for more than 100 years and produced some of the highest silver-lead-zinc grades in the world. It is the founding deposit of BHP, the world's largest mining company.
The 2019 program has recently discovered at pads MZ32, MZ33 and MZ34 high grade massive sulphides in between the massive sulphides intersected at the Discovery Target and the Extension Target. These high-grade massive sulphides have been displaced to the north by faulting and perhaps folding. As the high-grade mineralization in this area occurs under overburden and has not been detectable using geophysics, structural geologist Chris Buchanan has been unravelling this structural history by relogging the drill core situated in Kelowna, BC. He intends to complete the structural logging of the core situated at the North Rackla camp at the end of March. His work will assist in drill targeting for the upcoming season.
The Company continues to be impressed by the results and potential of the project and looks forward to the coming drill program.
Cantex has issued an aggregate of 250,000 options at $0.80 for a period of 5 years to a director and a consultant to the Company as of March 9, 2020.
The technical information and results reported here have been reviewed by Mr. Chad Ulansky P.Geol., a Qualified Person under National Instrument 43-101, who is responsible for the technical content of this release.
Signed,
Charles Fipke
Charles Fipke Chairman
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Information set forth in this news release includes forward-looking statements under applicable securities laws. Forward-looking statements are statements that relate to future, not past, events. In this context, forward-looking statements often address expected future business and financial performance, and often contain words such as "anticipate", "believe", "plan", "estimate", "expect", and "intend", statements that an action or event "may", "might", "could", "should", or "will" be taken or occur, or other similar expressions. All statements, other than statements of historical fact, included herein are forward-looking statements. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, risks identified in the management discussion and analysis section of the Company's interim and most recent annual financial statement or other reports and filings with Canadian securities regulators. Forward looking statements are made based on management's beliefs, estimates and opinions on the date that statements are made and the respective companies undertakes no obligation to update forward-looking statements if these beliefs, estimates and opinions or other circumstances should change, except as required by applicable securities laws. Investors are cautioned against attributing undue certainty to forward-looking statements.
SOURCE Cantex Mine Development Corp.
Cantex Mine Development Corp, Tel: +1-250-860-8582, Email: [email protected]