Amarc Makes Important New Gold Discovery in South-Central British Columbia
"Through careful examination of historical drill core and remodelling of both existing geological data and information received from the recent drill campaign, Amarc's technical team has made an important new gold discovery in the province of British Columbia," said Amarc
Historical drilling at the Newton property tested for porphyry-style copper mineralization with low grade copper results. However, Amarc's examination of the historical drill core and gold analyses revealed an extensive area characterized by geologically significant concentrations of gold with anomalous silver, copper and zinc. In addition, four historical drill holes (06-12, 06-03, 92-04 and 06-11) positioned on the easternmost side of all the historical drilling, intercepted 105 metres of 1.15 g/t gold (including 41 metres at 2.49 g/t gold), 95 metres of 0.52 g/t gold, 60 metres of 0.69 g/t gold and 46 metres of 0.54 g/t gold, respectively (see maps at www.amarcresources.com). These historical holes indicated a compelling drill target; an open ended, large-scale gold system.
Significant assay intervals from Amarc's first seven drill holes, representing continuous intersections of bulk tonnage-style, gold, silver, copper and zinc mineralization, are listed in the Table of Assay Results below.
AMARC RESOURCES LIMITED - NEWTON PROJECT TABLE OF ASSAY RESULTS ------------------------------------------------------------------------- Hole Hole Direc- Drill Dip tion Hole (deg- (deg- From To Int. Int. Au Ag Cu Zn AuEQ(1) ID Incl. rees) rees) (m) (m) (m) (ft) (g/t) (g/t) (%) (%) (g/t) ------------------------------------------------------------------------- 9001 -45 90 3.0 39.0 36.0 118 0.60 0.9 0.01 0.00 0.63 ------------------------------------------------------------------------- 9001 -45 90 228.0 297.0 69.0 226 1.41 10.9 0.12 0.05 1.85 ------------------------------------------------------------------------- 9001 incl. -45 90 233.1 234.0 0.9 3 11.19 22.2 0.21 0.87 12.49 ------------------------------------------------------------------------- 9001 incl. -45 90 252.8 297.0 44.2 145 1.74 15.9 0.17 0.02 2.34 ------------------------------------------------------------------------- 9001 -45 90 441.0 477.0 36.0 118 0.34 0.6 0.03 0.01 0.42 ------------------------------------------------------------------------- 9002 -90 0 222.0 255.2 33.2 109 0.96 2.8 0.07 0.01 1.16 ------------------------------------------------------------------------- 9002 incl. -90 0 234.0 252.0 18.0 59 1.10 3.3 0.09 0.01 1.33 ------------------------------------------------------------------------- 9003 -90 0 3.0 224.5 221.5 727 0.60 5.6 0.07 0.08 0.87 ------------------------------------------------------------------------- 9003 incl. -90 0 18.0 39.0 21.0 69 0.71 2.3 0.01 0.00 0.77 ------------------------------------------------------------------------- 9003 incl. -90 0 96.0 224.5 128.5 421 0.84 8.9 0.10 0.13 1.26 ------------------------------------------------------------------------- 9003 and -90 0 156.0 198.0 42.0 138 1.25 16.8 0.20 0.11 1.98 ------------------------------------------------------------------------- 9004 -90 0 6.0 195.0 189.0 620 1.56 7.9 0.08 0.17 1.95 ------------------------------------------------------------------------- 9004 incl. -90 0 54.0 195.0 141.0 463 2.01 10.0 0.10 0.22 2.49 ------------------------------------------------------------------------- 9004 and -90 0 96.0 195.0 99.0 325 2.76 12.2 0.12 0.26 3.36 ------------------------------------------------------------------------- 9004 and -90 0 126.0 195.0 69.0 226 3.79 9.1 0.08 0.30 4.26 ------------------------------------------------------------------------- 9004 and -90 0 129.0 132.0 3.0 10 13.47 14.4 0.17 0.12 14.10 ------------------------------------------------------------------------- 9004 and -90 0 168.9 195.0 26.1 86 5.54 12.5 0.07 0.31 6.08 ------------------------------------------------------------------------- 9005 -90 0 12.0 27.0 15.0 49 0.32 1.4 0.04 0.02 0.43 ------------------------------------------------------------------------- 9005 -90 0 41.0 54.0 13.0 43 0.44 4.4 0.06 0.30 0.81 ------------------------------------------------------------------------- 9005 -90 0 76.0 163.2 87.2 286 0.50 7.1 0.03 0.55 1.01 ------------------------------------------------------------------------- 9005 incl. -90 0 88.0 89.0 1.0 3 16.56 221.6 0.30 2.55 22.38 ------------------------------------------------------------------------- 9005 -90 0 279.0 303.0 24.0 79 0.34 0.8 0.07 0.01 0.48 ------------------------------------------------------------------------- 9006 -90 0 9.0 306.5 297.5 976 0.26 2.3 0.03 0.13 0.44 ------------------------------------------------------------------------- 9006 incl. -90 0 78.0 192.2 114.2 375 0.32 3.7 0.03 0.25 0.60 ------------------------------------------------------------------------- 9006 incl. -90 0 264.0 306.5 42.5 139 0.43 0.6 0.05 0.01 0.53 ------------------------------------------------------------------------- 9007 -90 0 48.0 252.0 204.0 669 0.33 4.5 0.05 0.11 0.57 ------------------------------------------------------------------------- 9007 incl. -90 0 48.0 66.0 18.0 59 0.49 1.9 0.04 0.02 0.60 ------------------------------------------------------------------------- 9007 incl. -90 0 135.0 216.0 81.0 266 0.46 8.0 0.07 0.20 0.85 ------------------------------------------------------------------------- 9007 and -90 0 183.0 216.0 33.0 108 0.62 13.4 0.12 0.16 1.17 ------------------------------------------------------------------------- 1. Gold equivalent calculations use metal prices of Au US$900/oz, Ag US $15/oz, Cu US$2.50/lb and Zn US$0.80/lb Metallurgical recoveries and net smelter returns are assumed to be 100% AuEQ equals (Au g/t) + (Ag g/t x 0.482/28.94) + (Cu % x 55.12/28.94) + (Zn % x 17.64/28.94)
The most intensively developed mineralization at Newton is associated with disseminated sulphides that appear to be preferentially localized within pervasively altered volcaniclastic and epiclastic rock units. These host rocks are characterized by both a high primary permeability and an anticipated wide geographical distribution - features that are representative of a permissive environment for development of bulk tonnage-style mineralization. Additional drilling is required to confirm the dimensions and orientation of the mineralization. Amarc's drilling and field work program, indicate that Newton may represent a gold deposit transitional between a typical copper-gold porphyry and an epithermal-type gold deposit - a new gold deposit type for BC.
The Newton Property is located within south-central BC's Chilcotin Plateau, approximately 110 kilometers southwest of the City of
The Chilcotin region of BC is characterized by low-lying and gently rolling hills and is well served by existing transportation and power infrastructure, supporting a number of operating mines and late-stage development projects. These include the
Investment in mineral development enjoys broad public support in
Amarc Resources Ltd. is a Vancouver-based exploration and development company focused on developing the next major mineral deposit in British Columbia. Amarc is affiliated with the
Mark Rebagliati, P.Eng., a Qualified Person as defined under National Instrument 43-101, is supervising the exploration and quality assurance and quality control programs on behalf of Amarc and has reviewed the content of this release. For further details on Amarc Resources Ltd., please visit the Company's website at www.amarcresources.com or contact Investor Services at (604) 684-6365 or within
Ronald W. Thiessen President & CEO The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this press release. Cautionary and Forward Looking Statement Information
This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts that address exploration drilling, exploitation activities and other related events or developments are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration successes, continuity of mineralization, uncertainties related to the ability to obtain necessary permits, licenses and title and delays due to third party opposition, geopolitical uncertainty and political and economic instability, changes in government policies regarding mining and natural resource exploration and exploitation, and continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. For more information on Amarc Resources Ltd., investors should review the Company's annual Form 20-F filing with the
For further information: on Amarc Resources Ltd., please visit the Company's website at www.amarcresources.com or contact Investor Services at (604) 684-6365 or within North America at 1-800-667-2114
Share this article