Bonaventure Expressway: Postponement of Work Scheduled for September 23 and
24
LONGUEUIL, QC,
The work scheduled for
Detour routes have been planned in the area where the work is taking place. However, motorists are invited to use the other bridges to the South Shore during the duration of the work, as well as the public transportation system.
Details of the closures: Complete closure of the Bonaventure Expressway going east (Champlain Bridge) and west (Downtown Montreal) at Exit 2 including: 1. Closure of the Wellington St. on-ramp 2. Complete closure of Pierre-Dupuy Ave. under the Bonaventure Expressway 3. Closure of one of two lanes on Pierre-Dupuy Ave. going south and on Des Irlandais Street going north
For further information, please visit the JCCBI website at www.jccbi.ca.
For further information: Jean-Vincent Lacroix, AGC Communications, (514) 849-7000, ext. 230, Cell: (514 249-1940, [email protected]; Source: André Girard, Vice-President, Communications, The Federal Bridge Corporation, (450) 468-5775, [email protected]
Share this article