Capstone Reports Final High Grade Copper-Gold Results From Minto North Infill
Drilling
Hole 09SWC511 intercepts 3.3% Cu & 2.0g/t Au over 22.4m (including 6.4% Cu & 3.0g/t Au over 7.2m) Hole 09SWC527 intercepts 19.9% Cu & 4.8g/t Au over 2.0m (including 39.6% Cu & 0.65g/t Au over 1.0m)
Latest Highlights from Minto North Drilling ------------------------------------------- ------------------------------------------------------------------------- Target From To Interval Interval Copper Gold Silver Hole ID Area (m) (m) (m)* (ft)* (%) (g/t) (g/t) ------------------------------------------------------------------------- 09SWC-504 Minto 59.0 99.6 40.6 133.2 2.14 1.39 8.4 North ------------------------------------------------------------------------- including 80.0 97.0 17.0 55.8 3.70 2.73 15.7 ------------------------------------------------------------------------- 09SWC-507 Minto 84.4 107.8 23.4 76.8 3.66 1.95 13.5 North ------------------------------------------------------------------------- including 85.4 97.0 11.6 38.1 5.68 2.87 21.2 ------------------------------------------------------------------------- 09SWC-511 Minto 83.1 105.5 22.4 73.5 3.32 1.95 13.8 North ------------------------------------------------------------------------- including 83.1 90.3 7.2 23.6 6.43 2.95 26.6 ------------------------------------------------------------------------- 09SWC-515* Minto 64.1 90.7 26.6 (25.3) 87.3 (83.0) 1.76 0.64 6.0 North ------------------------------------------------------------------------- including 84.7 90.7 6.0 (5.7) 19.7 (18.7) 3.04 1.37 13.9 ------------------------------------------------------------------------- 09SWC-527 Minto 61.5 63.5 2.00 6.6 19.89 4.80 86.6 North ------------------------------------------------------------------------- including 62.5 63.5 1.00 3.3 39.60 0.65 172.0 ------------------------------------------------------------------------- * Estimated true thickness in parenthesis
"The five holes highlighted above once again illustrate the high grade nature of the Minto North deposit," said
Minto North Deposit
Capstone previously announced a preliminary mineral resource estimate for Minto North on
Results for this final batch of 25 holes marks the successful conclusion of the infill program and brings to 86 the number of drillholes delineating this deposit, up from 31 which was the basis of the initial mineral resource estimate. With a 177% increase in the number of drill holes over the original model and using a drillhole spacing similar to that which supports the definition of measured & indicated mineral resources and mineral reserves elsewhere at the Minto Mine, Capstone believes it has the confidence level required for a conversion of these mineral resources to mineral reserves, should economic factors warrant.
For current drillhole locations please view the accompanying map:
http://www.capstonemining.com/i/photos/minto/2009-33MintoDrillResultsUpdate.jpg
For an inset view of drill results at Minto North please view the accompanying map:
http://www.capstonemining.com/i/photos/minto/2009-33MintoNorthDrillResultsDetails.jpg
The TSX does not accept any responsibility for the adequacy or accuracy of this press release.
Quality Assurance
The technical information in this news release has been prepared in accordance with Canadian regulatory requirements set out in National Instrument 43-101 and reviewed by Stephen P. Quin, P. Geo., President & COO for Capstone Mining Corporation. The exploration activities at the Minto project site are carried out under the supervision of
The analytical method for the copper and silver analyses is aqua regia digestion of the samples followed by atomic absorption spectroscopy. Gold is analysed by fire assay fusion with atomic absorption spectroscopy finish for gold. Analyses are carried out by ALS CHEMEX in North
Forward-Looking Statements
This document may contain "forward-looking information" within the meaning of Canadian securities legislation and "forward-looking statements" within the meaning of the
Forward-looking statements relate to future events or future performance and reflect Company management's expectations or beliefs regarding future events and include, but are not limited to, statements with respect to the estimation of mineral reserves and mineral resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, success of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage. In certain cases, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative of these terms or comparable terminology. By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, risks related to actual results of current exploration activities; changes in project parameters as plans continue to be refined; future prices of mineral resources; possible variations in ore reserves, grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities; as well as those factors detailed from time to time in the Company's interim and annual financial statements and management's discussion and analysis of those statements, all of which are filed and available for review on SEDAR at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.
Accordingly, readers should not place undue reliance on forward-looking statements.
Details of Minto North (only) Drill Results ------------------------------------------- To accompany Capstone Mining News Release Dated September 21, 2009 ------------------------------------------------------------------------- Hole ID & From To Interval Interval Copper Gold Silver Interval Target (m) (m) (m) (feet) (%) (g/t) (g/t) ------------------------------------------------------------------------- 09SWC-504 Minto 59.0 99.6 40.6 133.2 2.14 1.39 8.4 North ------------------------------------------------------------------------- including 80.0 97.0 17.0 55.8 3.70 2.73 15.7 ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-505 Minto Assays Previously Released to 506 North ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-507 Minto 84.4 107.8 23.4 76.8 3.66 1.95 13.5 North ------------------------------------------------------------------------- including 85.4 97.0 11.6 38.1 5.68 2.87 21.2 ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-508 Minto Assays Previously Released North ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-509 Minto 146.7 167.0 20.3 66.6 0.35 0.13 1.6 North ------------------------------------------------------------------------- 148.8 156.8 8.0 26.2 0.63 0.21 2.7 ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-511 Minto 83.1 105.5 22.4 73.5 3.32 1.95 13.8 North ------------------------------------------------------------------------- including 83.1 90.3 7.2 23.6 6.43 2.95 26.6 ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-512 Minto 25.5 45.1 19.6 64.3 1.40 0.34 3.9 North ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-513 Minto 54.1 74.2 20.1 65.9 1.43 0.38 3.7 North ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-514* Minto 42.3 69.5 27.2(23.6) 89.2(77.4) 1.52 0.30 3.9 North ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-515* Minto 64.1 90.7 26.6(25.3) 87.3(83.0) 1.76 0.64 6.0 North ------------------------------------------------------------------------- including 84.7 90.7 6.0(5.7) 19.7(18.7) 3.04 1.37 13.9 ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-516 Minto 86.8 90.5 3.7 12.1 1.36 0.71 10.2 North ------------------------------------------------------------------------- and 127.2 155.6 28.4 93.2 0.34 0.21 1.8 ------------------------------------------------------------------------- including 133.5 141.0 7.5 24.6 0.75 0.47 3.7 ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-517* Minto 29.6 45.6 16.0(15.0) 52.5(49.2) 1.07 0.26 3.2 North ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-518 Minto 19.6 53.2 33.6 110.2 1.11 0.19 2.5 North ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-519* Minto 26.6 68.2 41.6(33.2) 136.5(108.9) 0.82 0.16 2.0 North ------------------------------------------------------------------------- including 26.6 29.3 2.7(2.2) 8.9(7.2) 2.05 0.31 6.4 ------------------------------------------------------------------------- and 53.4 68.2 14.8(11.8) 48.6(38.7) 1.11 0.18 2.6 ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-520 Minto 66.6 90.2 23.6 77.4 1.04 0.28 2.8 North ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-521 Minto 31.5 61.5 30.0 98.4 0.90 0.23 2.5 North ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-522 Minto 24.8 61.6 36.8 120.7 0.92 0.14 1.9 North ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-523* Minto 56.9 81.7 24.8(23.6) 81.4(77.4) 1.01 0.31 3.6 North ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-524 Minto 16.7 46.0 29.3 96.1 0.73 0.08 2.3 North ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-525 Minto 64.7 85.2 20.5 67.3 1.47 0.46 4.5 North ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-526 Minto 42.0 68.4 26.4 86.6 0.76 0.16 2.3 North ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-527 Minto 61.5 63.5 2.00 6.6 19.89 4.80 86.6 North ------------------------------------------------------------------------- including 62.5 63.5 1.00 3.3 39.60 0.65 172.0 ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-528 Minto 44.0 70.8 26.8 87.9 0.49 0.06 1.1 North ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-529* Minto Geochemically Anomalous - No Significant Assays North ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-530* Minto 43.1 77.5 34.4(31.9) 112.9(104.7) 0.70 0.09 1.9 North ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-531 Minto 63.0 91.9 28.9 94.8 0.67 0.11 2.5 North ------------------------------------------------------------------------- ------------------------------------------------------------------------- 09SWC-532* Minto Geochemically Anomalous - No Significant Assays North ------------------------------------------------------------------------- * Estimated true thickness in parenthesis
For further information: Darren Pylot, Vice Chairman & CEO, Stephen Quin, President & COO; Or Investor Relations' Mark Patchett at (604) 684-8894 or (866) 684-8894, [email protected]
Share this article