Location | Hole ID | Intercept width | Grade (g/t Au) | Depth From |
Main Vein | MV012 | 33m | 1.73 | 259m |
MV012 | 19m | 2.71 | 318m | |
MV013 | 49m | 1.28 | 264m | |
MV018 | 5m | 15.56 | 145m | |
BMVDH023 | 11m | 4.50 | 0m | |
BMVDH018 | 3m | 16.62 | 57m | |
BMVDH019 | 3m | 14.25 | 35m | |
Libra East | LERC020 | 32m | 1.62 | 127m |
LERC025 | 20m | 1.89 | 123m | |
LERC031 | 46m | 2.47 | 2m | |
LERC034 | 28m | 1.85 | 82m | |
Aquarius | AQDD010 | 17m | 1.97 | 54m |
Panique | PQRC001 | 4m | 44.71 | 61m |
PQRC040 | 47m | 1.44 | 219m | |
PQRC041 | 10m | 14.53 | 10m | |
PQRC048 | 21m | 3.45 | 69m | |
PQRC052 | 58m | 1.11 | 61m | |
PQRC052 | 34m | 1.84 | 143m | |
PQRC060 | 40m | 4.18 | 32m | |
PQRC060 | 20m | 1.77 | 150m | |
Colorado | COL028 | 47m | 1.30 | 130m |
MASBATE GOLD PROJECT UPDATE
Ore Mine (t) |
Average Grade Mined (g/t Au) |
Ore Milled (t) |
Head Grade (g/t Au) |
Recovery (%) |
Plant Availability (%) |
Total Production (oz Au) |
Cash Operating Costs (US $/oz) |
|
March Quarter |
1,611,639 | 1.11 | 1,586,549 | 1.12 | 86.4 | 94.1 | 49,199 | 753 |
December Quarter |
1,223,845 | 1.02 | 866,140 | 1.10 | 90.6 | 87.7 | 27,820 | 832 |
Processing
The process plant throughput increased 83% to 1,586,549 tonnes at 1.12g/t (December Qtr 866,140 tonnes at 1.10g/t) which is the second highest quarterly throughput rate to date at the Project.
Gold production increased 77% to 49,199 oz (December Qtr 27,820 oz) at a recovery of 86.4% (December Qtr 90.6%). The movement in the recovery % was affected primarily by a change in feed type and decreased residence time.
Plant availability improved significantly to a high of 94.1% (December Qtr 87.7%) with all areas of the plant performing well. The SAG mill has operated trouble free since recommissioning on 25 December and has operated at greater than 6.5mtpa rates in February and March reaching an equivalent of 6.9mtpa in March.
Cash costs reduced 10% to $753/oz (December Qtr $832/oz).
Cash costs per tonne milled dropped to $23.24 compared to $25.66 in the December quarter.
The gross project operating cash flow before working capital for the quarter was US$29.896M (an increase of 109% from the December quarter of US$14.330M) from gross gold proceeds of sale of US$63.188M.
Safety
There were no Lost Time Injuries in the quarter with the site achieving 307 days without a lost time injury to result in an LTI Frequency rate of 0.18.
An earthquake reported to measure 5.2 on the Richter Scale struck Masbate City on 6 March and was felt on site as a minor tremor. The earthquake caused no damage to infrastructure and did not interrupt processing.
Mining and Geology
Mine production rose 54% to 2,547,823 BCM (December Qtr 1,650,383 BCM) following the resumption of SAG mill operations to produce 1,611,639 tonnes of ore (December Qtr 1,223,845 tonnes) from Colorado, Binstar, HMB East and Main Vein Pit. The additional material movement and ore production was sourced from oxide areas of Colorado Pit.
Optimisation Study
The Lycopodium Optimisation Study to consider a number of alternative development options which better utilise existing infrastructure (and accordingly may provide significant capital expenditure reductions compared to the alternative which makes the current front end redundant) is continuing to progress well. It is still anticipated that the study will be finalised in the June quarter.
Exploration and Near Mine Resource Drilling Summary
Drilling this quarter was principally split between resource infill drilling at Panique, Main Vein, Libra East, HMBNW, Colorado, and new drilling at the Blue Quartz and Old Lady prospects. A total of 11,198m of reverse circulation and 8,823m of diamond core drilling were completed.
Following on from last quarter, further excellent results were returned from drilling at the Main Vein, Libra East, Aquarius, Panique, Old Lady and Colorado prospects. These results provide excellent upside potential for pit extensions and additional mine life.
Regional mapping and sampling continued this quarter and this program has successfully delineated a number of geochemically anomalous trends that are the subject of further evaluation.
Preparatory work (gridding and line clearing) for a planned Induced Polarisation survey over the Baleno Copper prospect was also completed this month. This prospect, located within the Baleno Diorite, is a porphyry copper target. It displays spatial and genetic relationships common to epithermal - porphyry systems elsewhere in the Philippines.
Drilling statistics for March Quarter 2012
Locations | RC | Diamond | ||
Holes | Metres | Holes | Metres | |
Panique | 27 | 4,365 | 1 | 41 |
Main Vein | 15 | 4,350.6 | ||
Libra East | 6 | 2,141.5 | 14 | 2,705.9 |
Colorado | 4 | 935 | 5 | 511.7 |
HMBNW | 3 | 416 | 2 | 463 |
Blue Quartz | 22 | 2,981 | 1 | 151.75 |
Old Lady | 2 | 360 | 3 | 751.3 |
Totals | 64 | 11,198.5 | 40 | 8,823.5 |
To view the map, please visit: http://files.newswire.ca/578/CGA_MASBATE.pdf
Drilling Activities
At Panique the reverse circulation drilling program initiated last quarter continued this quarter with a further 27 holes (4,365m) completed. The area drilled so far is structurally complex, containing multiple intersecting vein systems. The Panique - 28 Lacer Vein has returned consistent results over a 220m strike with intersections to 17m and grades in the range 1.0 - 2.3g/t Au. The Panique HWS Vein also shows good continuity over a 250m strike with intersections up to 35m and grades greater than 1.0g/t Au. The Panique 26 HWS Vein is generally thin and low grade however does contain a high grade shoot intersected in PQRC001 (3m @ 59.44g/t Au from 61m).
At Main Vein North Split diamond core drilling has continued this quarter with 4 holes completed (1,426.1m). Two vein sets were targeted by this program, the North Split and Doris Veins. Results indicate Doris Vein contains good grades within the current pit shell, however, diminishes at greater depth. The North Split Vein is similar with holes MV001 & 002 defining good grade and thickness of mineralisation at moderate depth (17m @ 3.33g/t Au from 198m, 19m @ 1.77g/t Au from 155m). Recent drilling has concentrated on the structurally complex western end of this vein where it converges with the Libra East Vein with holes MV012 & 013 intersecting up to 49m @ 1.28g/t Au. Further drilling from Libra East is planned to fully investigate this convergence which has high potential to contribute additional resources.
The Main Vein - Binstar Deeps program was designed to test for depth extensions of the mineralised veins below the planned pit floor. Drilling at the northern end of the Binstar pit was completed this quarter with 11 holes (2,924.5m). Drilling here targeted the Star and Binstar Footwall Split veins with a series of holes drilled from the eastern margin of the Binstar Pit. Results indicate potential for additional resources extending +20m below the planned pit floor in the north - central portion of the pit where BMVDH019 returned 6m @ 3.53g/t Au from 112m. At Libra East an additional 39 hole program (10,161m) was designed to follow up excellent results from the holes drilled last year, testing the depth extent of the mineralisation and the sparsely drilled eastern end of the system. This quarter 20 holes were drilled (4,846.9m). The holes were a combination of RC, RC with diamond tail, and fully diamond cored. Results so far indicate a consistent, wide, high grade vein system extending over 500m strike. All recent intersections are below the current pit floor and may lead to a local deepening of current designs. Current drilling is focussing on further depth extensions.
No further drilling was undertaken at Aquarius this quarter, however results were received for all drilling completed to date. These results confirm the continuity of the mineralised zone which is up to 46m wide over a strike of 120m at a grade of 1 - 2g/t Au.
Drilling recommenced at the Old Lady prospect this quarter with 24 holes (4,840m) planned to infill areas of inferred resources (based on results received last quarter) and test for down dip extensions of known mineralisation to 200m vertical. A total of 2 RC holes (360m) and 3 RC/core holes were completed (751.3m). There is high potential for the current drilling program to increase resources at Old Lady with hole ODRC038 intersecting 35m @ 2.57g/t Au below the current pit floor. Drilling now in progress will test the full strike extent of this prospect at depth.
Regional Mapping & Sampling
The regional mapping team continued working towards the south of the Exploration Permit area covering an additional 11km2 this quarter. A total of 758 stream and 487 rock chip samples were taken.
Results are now available for stream and rock chip samples covering 70% of EP10. Results from -80# stream sampling have identified a number of Au anomalies:
Table of Anomalous Intersections
PANIQUE
Hole-ID | Easting | Northing | RL | Azm | Dip | Total Depth |
From | To | Down Hole Width (m) |
True Width (m) | Grade (g/t) |
PQRC001 | 30201 | 25007 | 1150 | 270 | -86 | 123 | 47 | 58 | 11 | 5.8 | 2.45 |
61 | 65 | 4 | 2.1 | 44.71 | |||||||
PQRC002 | 30218 | 24996 | 1150 | 92 | -55 | 192 | 116 | 139 | 23 | 16.5 | 0.75 |
PQRC005 | 30201 | 25007 | 1150 | 3 | -67 | 147 | 17 | 25 | 8 | 4.4 | 0.95 |
PQRC026 | 30270 | 24861 | 1150 | 232 | -60 | 154 | 3 | 7 | 4 | 2.4 | 0.72 |
36 | 40 | 4 | 2.5 | 1.06 | |||||||
PQRC027 | 30232 | 24877 | 1151 | 20 | -60 | 48 | 25 | 30 | 5 | 2.7 | 1.41 |
PQRC030 | 30206 | 24945 | 1150 | 270 | -60 | 81 | 20 | 26 | 6 | 3.9 | 2.36 |
54 | 68 | 14 | 9.0 | 0.77 | |||||||
PQRC031 | 30237 | 24993 | 1151 | 92 | -52 | 143 | 96 | 113 | 17 | 13.0 | 1.14 |
119 | 140 | 21 | 16.1 | 0.89 | |||||||
PQRC032 | 30231 | 24984 | 1151 | 270 | -86 | 175 | 61 | 67 | 6 | 3.6 | 3.04 |
106 | 120 | 14 | 6.8 | 0.87 | |||||||
PQRC033 | 30160 | 24866 | 1148 | 22 | -60 | 102 | 53 | 56 | 3 | 1.9 | 1.97 |
61 | 65 | 4 | 2.6 | 1.22 | |||||||
78 | 91 | 13 | 6.9 | 1.61 | |||||||
PQRC034 | 30182 | 24841 | 1148 | 19 | -60 | 182 | 11 | 27 | 16 | 10.3 | 1.92 |
33 | 37 | 4 | 2.6 | 1.03 | |||||||
75 | 78 | 3 | 1.9 | 1.48 | |||||||
82 | 89 | 7 | 4.5 | 1.81 | |||||||
104 | 108 | 4 | 2.6 | 2.21 | |||||||
PQRC035 | 30163 | 24883 | 1148 | 26 | -56 | 132 | 2 | 26 | 24 | 16.8 | 1.21 |
41 | 51 | 10 | 7.0 | 1.65 | |||||||
59 | 62 | 3 | 1.7 | 1.29 | |||||||
64 | 73 | 9 | 5.1 | 3.16 | |||||||
117 | 130 | 13 | 10.0 | 1.40 | |||||||
PQRC036 | 30200 | 25006 | 1150 | 67 | -82 | 194 | 60 | 65 | 5 | 3.0 | 1.59 |
119 | 147 | 28 | 16.9 | 0.98 | |||||||
157 | 161 | 4 | 2.4 | 8.14 | |||||||
169 | 177 | 8 | 4.8 | 1.32 | |||||||
PQRC037 | 30220 | 24942 | 1151 | 95 | -56 | 239 | 119 | 129 | 10 | 7.2 | 1.04 |
142 | 153 | 11 | 7.9 | 1.22 | |||||||
178 | 206 | 28 | 20.2 | 1.57 | |||||||
PQRC038 | 30255 | 24935 | 1150 | 95 | -55 | 102 | 63 | 81 | 18 | 13.2 | 1.03 |
PQRC039 | 30254 | 24937 | 1150 | 205 | -55 | 236 | 33 | 38 | 5 | 3.4 | 1.08 |
67 | 72 | 5 | 3.4 | 0.93 | |||||||
82 | 87 | 5 | 3.4 | 1.63 | |||||||
102 | 117 | 15 | 14.6 | 0.94 | |||||||
PQRC040 | 30225 | 24900 | 1150 | 90 | -60 | 284 | 69 | 77 | 8 | 4.6 | 0.92 |
151 | 216 | 65 | 44.3 | 0.85 | |||||||
219 | 266 | 47 | 32.1 | 1.44 | |||||||
PQRC041 | 30182 | 24920 | 1150 | 200 | -60 | 69 | 10 | 20 | 10 | 5.3 | 14.53 |
58 | 64 | 6 | 3.9 | 2.63 | |||||||
PQRC043 | 30240 | 24913 | 1151 | 97 | -58 | 171 | 127 | 142 | 15 | 10.6 | 0.69 |
154 | 165 | 11 | 7.8 | 1.81 | |||||||
PQRC044 | 30237 | 24914 | 1151 | 207 | -55 | 168 | 99 | 105 | 6 | 6.0 | 1.26 |
PQRC045 | 30272 | 24860 | 1150 | 208 | -63 | 184 | 15 | 26 | 11 | 6.6 | 1.12 |
65 | 69 | 4 | 2.3 | 5.02 | |||||||
PQRC046 | 30235 | 24819 | 1151 | 25 | -62 | 183 | 44 | 51 | 7 | 3.8 | 1.64 |
77 | 83 | 6 | 3.4 | 2.98 | |||||||
86 | 92 | 6 | 3.4 | 4.65 | |||||||
108 | 116 | 8 | 4.5 | 0.96 | |||||||
PQRC048 | 30230 | 24808 | 1151 | 82 | -55 | 179 | 40 | 48 | 8 | 5.9 | 5.67 |
69 | 90 | 21 | 15.1 | 3.45 | |||||||
112 | 130 | 18 | 13.4 | 1.31 | |||||||
PQRC049 | 30434 | 24747 | 1114 | 9 | -56 | 192 | 7 | 12 | 5 | 3.5 | 0.73 |
14 | 22 | 8 | 5.6 | 1.48 | |||||||
31 | 39 | 8 | 5.6 | 1.19 | |||||||
PQRC050 | 30285 | 24826 | 1135 | 12 | -58 | 174 | 88 | 109 | 21 | 12.9 | 1.14 |
114 | 166 | 52 | 32.0 | 0.67 | |||||||
PQRC051 | 30372 | 24806 | 1118 | 12 | -60 | 105 | 34 | 47 | 13 | 6.9 | 0.98 |
53 | 58 | 5 | 2.6 | 1.36 | |||||||
81 | 99 | 18 | 9.5 | 1.00 | |||||||
PQRC052 | 30279 | 24807 | 1134 | 15 | -60 | 177 | 61 | 119 | 58 | 33.3 | 1.11 |
130 | 141 | 11 | 6.3 | 1.34 | |||||||
143 | 177 | 34 | 19.5 | 1.81 | |||||||
PQRC054 | 30368 | 24802 | 1118 | 279 | -58 | 150 | 42 | 52 | 10 | 6.9 | 2.45 |
106 | 113 | 7 | 5.3 | 1.04 | |||||||
PQRC055 | 30309 | 24825 | 1135 | 14 | -60 | 110 | 27 | 37 | 10 | 6.4 | 3.16 |
46 | 58 | 12 | 7.7 | 1.09 | |||||||
64 | 71 | 7 | 4.5 | 1.83 | |||||||
PQRC056 | 30213 | 24747 | 1145 | 84 | -50 | 219 | 153 | 167 | 14 | 11.3 | 1.16 |
PQRC058 | 30345 | 24821 | 1127 | 11 | -60 | 129 | 68 | 78 | 10 | 5.2 | 1.10 |
PQRC059 | 30334 | 24779 | 1118 | 11 | -60 | 154 | 31 | 43 | 12 | 7.6 | 1.08 |
51 | 64 | 13 | 8.2 | 1.81 | |||||||
PQRC060 | 30311 | 24806 | 1133 | 14 | -60 | 170 | 32 | 72 | 40 | 25.7 | 4.18 |
111 | 142 | 31 | 20.3 | 1.34 | |||||||
150 | 170 | 20 | 12.9 | 1.77 | |||||||
PQRC061 | 30222 | 24822 | 1151 | 73 | -57 | 215 | 70 | 75 | 5 | 3.4 | 1.46 |
92 | 102 | 10 | 6.9 | 1.28 | |||||||
156 | 191 | 35 | 25.2 | 1.21 | |||||||
PQRC062 | 30252 | 24841 | 1150 | 18 | -52 | 89 | 72 | 89 | 17 | 10.7 | 1.03 |
PQRC063 | 30333 | 24835 | 1135 | 34 | -58 | 74 | 3 | 8 | 5 | 2.9 | 1.93 |
22 | 27 | 5 | 2.9 | 3.21 | |||||||
41 | 45 | 4 | 2.3 | 1.13 | |||||||
47 | 52 | 5 | 2.9 | 6.50 | |||||||
55 | 58 | 3 | 1.7 | 5.57 | |||||||
59 | 65 | 7 | 4.0 | 0.95 | |||||||
PQRC064 | 30275 | 24779 | 1133 | 83 | -58 | 105 | 19 | 25 | 6 | 4.4 | 1.36 |
36 | 53 | 17 | 12.4 | 1.22 | |||||||
65 | 77 | 12 | 8.8 | 0.86 | |||||||
81 | 105 | 24 | 17.6 | 0.96 | |||||||
PQRC065 | 30232 | 24808 | 1150 | 82 | -41 | 150 | 82 | 95 | 13 | 10.8 | 1.81 |
PQRC069 | 30255 | 24960 | 1151 | 194 | -63 | 190 | 17 | 24 | 7 | 3.9 | 1.16 |
119 | 131 | 12 | 6.0 | 0.93 | |||||||
PQRC070 | 30192 | 24772 | 1145 | 83 | -45 | 223 | 6 | 10 | 4 | 3.3 | 1.05 |
PQRC071 | 30363 | 24752 | 1116 | 12 | -46 | 163 | 32 | 37 | 5 | 3.8 | 1.14 |
116 | 130 | 14 | 10.1 | 0.76 | |||||||
146 | 152 | 6 | 4.3 | 1.00 | |||||||
PQRC072 | 30399 | 24797 | 1117 | 8 | -56 | 144 | 50 | 55 | 5 | 2.9 | 1.58 |
PQRC073 | 30199 | 24771 | 1145 | 83 | -40 | 160 | 0 | 2 | 2 | 1.7 | 8.83 |
PQRC074 | 30303 | 24842 | 1136 | 347 | -45 | 71 | 40 | 43 | 3 | 2.3 | 3.61 |
46 | 55 | 9 | 6.9 | 1.13 | |||||||
PQRC075 | 30423 | 24765 | 1110 | 250 | -60 | 174 | 0 | 10 | 10 | 6.4 | 0.75 |
117 | 121 | 4 | 2.8 | 1.31 | |||||||
171 | 174 | 3 | 2.1 | 1.55 | |||||||
PQRC079 | 30446 | 24659 | 1083 | 243 | -60 | 176 | 151 | 161 | 10 | 6.7 | 0.92 |
PQRC081 | 30398 | 24737 | 1115 | 240 | -55 | 144 | 22 | 27 | 5 | 3.8 | 1.23 |
97 | 105 | 8 | 6.5 | 1.64 | |||||||
PQRC083 | 30473 | 24647 | 1077 | 243 | -50 | 190 | 4 | 21 | 17 | 13.0 | 0.57 |
137 | 150 | 13 | 11.1 | 1.66 | |||||||
PQRC084 | 30498 | 24625 | 1069 | 243 | -45 | 120 | 45 | 52 | 7 | 6.2 | 0.98 |
72 | 76 | 4 | 3.6 | 0.93 | |||||||
PQRC086 | 30388 | 24565 | 1120 | 270 | -70 | 125 | 56 | 59 | 3 | 2.0 | 1.75 |
PQRC089 | 30440 | 24489 | 1117 | 242 | -58 | 74 | 2 | 6 | 4 | 2.7 | 1.08 |
PQRC092 | 30479 | 24413 | 1121 | 242 | -58 | 132 | 3 | 9 | 6 | 4.0 | 0.72 |
PQRC093 | 30508 | 24391 | 1120 | 242 | -61 | 130 | 108 | 112 | 4 | 2.8 | 1.40 |
LIBRA EAST
Hole-ID | Easting | Northing | RL | Azm | Dip | Total Depth |
From | To | Down Hole Width (m) |
True Width (m) | Grade (g/t) |
LERC020 | 29710 | 25460 | 1099 | 31 | -74 | 165 | 127 | 159 | 32 | 16.5 | 1.61 |
LERC023 | 29856 | 25344 | 1107 | 36 | -63 | 262 | 203 | 256 | 53 | 38.1 | 0.92 |
LERC025 | 29582 | 25487 | 1065 | 30 | -79 | 142 | 123 | 142 | 19 | 6.8 | 1.89 |
LERC026 | 29820 | 25337 | 1102 | 30 | -58 | 298 | 202 | 226 | 24 | 20.4 | 1.37 |
LERC027 | 29496 | 25517 | 1060 | 320 | -80 | 130 | 76 | 87 | 11 | 3.8 | 0.64 |
99 | 109 | 10 | 5.7 | 0.56 | |||||||
LERC029 | 29493 | 25516 | 1060 | 100 | -70 | 196 | 160 | 168 | 8 | 4.6 | 1.88 |
171 | 193 | 22 | 12.6 | 1.49 | |||||||
LERC030 | 29958 | 25394 | 1126 | Vert | -90 | 469 | 262 | 272 | 10 | 2.4 | 0.94 |
306 | 323 | 17 | 4.1 | 0.90 | |||||||
LERC031 | 30111 | 25452 | 1140 | 220 | -55 | 284 | 2 | 48 | 46 | 30.2 | 2.47 |
151 | 161 | 10 | 7.1 | 1.51 | |||||||
181 | 255 | 74 | 54.1 | 0.92 | |||||||
LERC033 | 30132 | 25459 | 1139 | 202 | -50 | 175 | 5 | 12 | 7 | 4.9 | 0.80 |
LERC034 | 30151 | 25456 | 1139 | 185 | -48 | 202 | 17 | 21 | 4 | 2.9 | 1.04 |
82 | 110 | 28 | 19.8 | 1.85 | |||||||
136 | 146 | 10 | 7.8 | 1.06 |
AQUARIUS
Hole-ID | Easting | Northing | RL | Azm | Dip | Total Depth |
From | To | Down Hole Width (m) |
True Width (m) | Grade (g/t) |
AQDD006 | 29772 | 25916 | 1070 | 10 | -52 | 214 | 70 | 79 | 9 | 7.1 | 1.21 |
125 | 150 | 25 | 18.6 | 1.04 | |||||||
158 | 175 | 17 | 12.6 | 1.11 | |||||||
AQDD007 | 29772 | 25916 | 1070 | 9 | -61 | 247 | 114 | 141 | 27 | 18.4 | 1.45 |
145 | 149 | 4 | 2.7 | 2.02 | |||||||
180 | 195 | 15 | 9.4 | 1.74 | |||||||
AQDD008 | 29772 | 25916 | 1070 | 39 | -28 | 190 | 140 | 165 | 25 | 24.4 | 1.48 |
172 | 176 | 4 | 3.9 | 1.67 | |||||||
AQDD009 | 29773 | 25915 | 1070 | 27 | -60 | 234 | 87 | 114 | 27 | 18.8 | 1.44 |
171 | 186 | 15 | 9.6 | 1.25 | |||||||
AQDD010 | 29724 | 25982 | 1068 | 45 | -46 | 134 | 54 | 71 | 17 | 13.8 | 1.97 |
85 | 109 | 24 | 19.4 | 1.69 | |||||||
AQDD011 | 29724 | 25981 | 1068 | 48 | -68 | 238 | 56 | 78 | 22 | 13.2 | 1.80 |
146 | 164 | 18 | 9.5 | 1.25 | |||||||
AQDD012 | 29724 | 25981 | 1069 | 48 | -75 | 296 | 70 | 88 | 18 | 9.0 | 1.34 |
AQDD013 | 29723 | 25981 | 1068 | 4 | -47 | 101 | 45 | 59 | 14 | 12.8 | 1.07 |
AQDD014 | 29723 | 25980 | 1068 | 4 | -64 | 154 | 60 | 72 | 12 | 8.6 | 1.64 |
AQDD015 | 29723 | 25980 | 1068 | 4 | -74 | 225 | 74 | 84 | 10 | 4.4 | 0.84 |
MAIN VEIN
Hole-ID | Easting | Northing | RL | Azm | Dip | Total Depth |
From | To | Down Hole Width (m) |
True Width (m) | Grade (g/t) |
BMVDH017 | 30627 | 25083 | 1072 | 240 | -24 | 367 | 49 | 57 | 8 | 8.2 | 2.41 |
125 | 143 | 18 | 17.5 | 0.81 | |||||||
255 | 261 | 6 | 5.9 | 1.88 | |||||||
338 | 360 | 22 | 21.7 | 0.96 | |||||||
BMVDH018 | 30616 | 25129 | 1075 | 240 | -25 | 396 | 5 | 11 | 6 | 5.8 | 3.43 |
57 | 60 | 3 | 2.9 | 16.62 | |||||||
193 | 197 | 4 | 3.8 | 1.57 | |||||||
BMVDH019 | 29582 | 25487 | 1065 | 30 | -79 | 142 | 35 | 38 | 3 | 1.1 | 14.25 |
57 | 61 | 4 | 1.4 | 2.95 | |||||||
85 | 91 | 6 | 2.2 | 1.04 | |||||||
112 | 118 | 6 | 1.7 | 3.53 | |||||||
131 | 141 | 10 | 2.8 | 0.85 | |||||||
BMVDH020 | 30563 | 25381 | 1075 | 262 | -45 | 289 | 131 | 148 | 17 | 13.0 | 0.81 |
BMVDH023 | 30592 | 25304 | 1078 | 273 | -52 | 321 | 0 | 11 | 11 | 7.5 | 4.50 |
BMVDH024 | 30603 | 25268 | 1080 | 252 | -38 | 285 | 116 | 120 | 4 | 3.4 | 1.17 |
143 | 156 | 13 | 11.0 | 1.16 | |||||||
189 | 195 | 9 | 7.8 | 0.77 | |||||||
BMVDH025 | 30603 | 25268 | 1080 | 252 | -50 | 309 | 195 | 199 | 4 | 2.9 | 2.22 |
209 | 212 | 3 | 2.2 | 1.12 | |||||||
BMVDH026 | 30610 | 25228 | 1080 | 237 | -34 | 226 | 9 | 11 | 2 | 1.7 | 10.83 |
141 | 145 | 4 | 3.7 | 3.43 | |||||||
186 | 190 | 4 | 3.5 | 1.21 |
MAIN VEIN NORTH SPLIT
Hole-ID | Easting | Northing | RL | Azm | Dip | Total Depth |
From | To | Down Hole Width (m) |
True Width (m) | Grade (g/t) |
MV007 | 30286 | 25244 | 1080 | 210 | -50 | 291 | 86 | 104 | 21 | 14.8 | 0.78 |
115 | 137 | 22 | 17.8 | 1.41 | |||||||
141 | 148 | 7 | 5.4 | 1.14 | |||||||
151 | 183 | 32 | 25.2 | 0.76 | |||||||
MV008 | 30343 | 25196 | 1080 | 220 | -60 | 300 | 135 | 146 | 11 | 6.3 | 1.05 |
156 | 166 | 10 | 6.0 | 1.11 | |||||||
MV009 | 30328 | 25318 | 1080 | 210 | -47 | 407 | 201 | 206 | 5 | 3.7 | 1.14 |
MV012 | 30279 | 25229 | 1080 | 316 | -58 | 370 | 277 | 310 | 33 | 19.9 | 1.73 |
318 | 337 | 19 | 11.4 | 2.71 | |||||||
MV013 | 30279 | 25230 | 1080 | 295 | -52 | 442 | 96 | 101 | 5 | 3.3 | 1.47 |
150 | 183 | 33 | 20.8 | 1.18 | |||||||
186 | 191 | 5 | 3.1 | 1.95 | |||||||
206 | 211 | 5 | 3.1 | 2.30 | |||||||
250 | 257 | 7 | 4.5 | 1.09 | |||||||
264 | 313 | 49 | 33.4 | 1.28 | |||||||
376 | 381 | 5 | 3.4 | 1.06 | |||||||
MV014 | 30379 | 25129 | 1080 | 230 | -62 | 299 | 220 | 223 | 3 | 1.8 | 2.29 |
MV015 | 30304 | 25298 | 1080 | 222 | -55 | 385 | 66 | 71 | 5 | 3.2 | 0.86 |
163 | 175 | 12 | 7.4 | 2.40 | |||||||
MV017 | 30275 | 25258 | 1080 | 222 | -54 | 310 | 77 | 82 | 5 | 3.1 | 2.39 |
83 | 92 | 9 | 5.7 | 1.98 | |||||||
127 | 135 | 8 | 5.5 | 1.08 | |||||||
MV018 | 30247 | 25246 | 1080 | 238 | -55 | 311 | 145 | 150 | 5 | 3.1 | 15.56 |
COLORADO
Hole-ID | Easting | Northing | RL | Azm | Dip | Total Depth |
From | To | Down Hole Width (m) |
True Width (m) | Grade (g/t) |
COL009 | 29931 | 27220 | 1182 | 236 | -56 | 99 | 12 | 45 | 33 | 27.0 | 0.80 |
COL010 | 30185 | 26869 | 1285 | 240 | -63 | 226 | 198 | 208 | 10 | 4.4 | 1.15 |
COL010 | 30185 | 26869 | 1285 | 240 | -63 | 226 | 24 | 32 | 8 | 9.8 | 1.07 |
130 | 147 | 17 | 7.9 | 0.84 | |||||||
198 | 208 | 10 | 1.8 | 1.15 | |||||||
COL011 | 30345 | 26467 | 1153 | 247 | -67 | 165 | 23 | 26 | 3 | 4.3 | 2.98 |
52 | 59 | 7 | 2.5 | 1.43 | |||||||
84 | 88 | 4 | 0.6 | 1.05 | |||||||
103 | 104 | 1 | 10.8 | 2.70 | |||||||
COL012 | 30364 | 26419 | 1131 | 259 | -62 | 110 | 68 | 83 | 15 | 1.8 | 1.11 |
COL013 | 30314 | 25455 | 1153 | 60 | -63 | 210 | 38 | 41 | 3 | 3.6 | 3.38 |
48 | 54 | 6 | 2.0 | 1.39 | |||||||
COL014 | 30421 | 26335 | 1102 | 50 | -61 | 134 | 116 | 119 | 3 | 5.8 | 1.59 |
COL020 | 30602 | 25989 | 1040 | 60 | -60 | 143 | 1 | 10 | 9 | 9.9 | 0.97 |
COL024 | 30624 | 26086 | 1037 | 60 | -60 | 115 | 1 | 17 | 16 | 3.2 | 1.98 |
COL026 | 30229 | 26803 | 1285 | 58 | -58 | 315 | 4 | 9 | 5 | 11.4 | 2.66 |
145 | 162 | 17 | 32.1 | 0.79 | |||||||
COL028 | 30163 | 26797 | 1285 | 62 | -62 | 210 | 130 | 177 | 47 | 3.4 | 1.30 |
178 | 183 | 5 | 5.5 | 1.40 | |||||||
193 | 201 | 8 | 3.4 | 2.33 | |||||||
COL029 | 30135 | 26838 | 1285 | 62 | -63 | 195 | 19 | 25 | 6 | 2.9 | 1.29 |
COL030 | 30109 | 2677 | 1285 | 62 | -65 | 338 | 35 | 40 | 5 | 2.6 | 1.58 |
67 | 72 | 5 | 10.9 | 1.71 | |||||||
77 | 96 | 19 | 6.3 | 0.53 | |||||||
134 | 145 | 11 | 27.0 | 0.90 |
MAIN VEIN DEEP
Hole-ID | Easting | Northing | RL | Azm | Dip | Total Depth |
From | To | Down Hole Width (m) |
True Width (m) | Grade (g/t) |
MVDD001 | 29795 | 25899 | 1070 | 159 | -32 | 1036 | 94 | 100 | 6 | 5.3 | 0.99 |
192 | 196 | 4 | 3.6 | 1.01 |
GRANDVIEW
Hole-ID | Easting | Northing | RL | Azm | Dip | Total Depth |
From | To | Down Hole Width (m) |
True Width (m) | Grade (g/t) |
GVRC004 | 29964 | 27446 | 1185 | 270 | -55 | 77 | 20 | 30 | 10 | 9.3 | 0.44 |
36 | 42 | 6 | 5.5 | 0.61 | |||||||
GVRC023 | 29875 | 27582 | 1174 | 88 | -51 | 130 | 78 | 98 | 20 | 18.7 | 0.46 |
GVRC024 | 29880 | 27528 | 1185 | 87 | -45 | 141 | 92 | 117 | 25 | 23.3 | 0.68 |
GVRC025 | 29867 | 27540 | 2184 | 75 | -45 | 165 | 144 | 161 | 17 | 16.4 | 0.67 |
OLD LADY
Hole-ID | Easting | Northing | RL | Azm | Dip | Total Depth |
From | To | Down Hole Width (m) |
True Width (m) | Grade (g/t) |
ODRC033 | 32168 | 23327 | 1099 | 180 | -64 | 117 | 1 | 4 | 3 | 1.8 | 1.01 |
ODRC034 | 31985 | 23409 | 1144 | 180 | -61 | 81 | 14 | 20 | 6 | 4.2 | 1.84 |
60 | 65 | 5 | 3.9 | 1.03 | |||||||
ODRC040 | 32052 | 23504 | 1111 | 180 | -60 | 119 | 77 | 98 | 21 | 15.6 | 0.92 |
ODRC041 | 31941 | 23593 | 1087 | 180 | -60 | 183 | 7 | 12 | 5 | 3.8 | 0.74 |
123 | 137 | 14 | 10.7 | 0.88 | |||||||
162 | 167 | 5 | 3.8 | 1.16 | |||||||
171 | 179 | 8 | 6.1 | 1.04 | |||||||
ODRC043 | 32004 | 23592 | 1080 | 180 | -60 | 274 | 169 | 177 | 8 | 6.4 | 1.80 |
BLUE QUARTZ
Hole-ID | Easting | Northing | RL | Azm | Dip | Total Depth |
From | To | Down Hole Width (m) |
True Width (m) | Grade (g/t) |
BQRC039 | 31691 | 23557 | 1047 | 16 | -60 | 120 | 20 | 25 | 5 | 3.5 | 1.00 |
28 | 31 | 3 | 2.1 | 1.63 | |||||||
64 | 70 | 6 | 4.2 | 0.80 | |||||||
BQRC042 | 31603 | 23592 | 1056 | 210 | -64 | 124 | 102 | 106 | 4 | 2.6 | 0.68 |
BQRC046 | 31281 | 23667 | 1046 | 16 | -60 | 153 | 37 | 44 | 7 | 4.9 | 0.82 |
COLORADO EAST
Hole-ID | Easting | Northing | RL | Azm | Dip | Total Depth |
From | To | Down Hole Width (m) |
True Width (m) | Grade (g/t) |
CER001 | 30696 | 27213 | 1070 | 220 | -60 | 107 | 66 | 72 | 6 | 3.9 | 1.1 |
77 | 82 | 5 | 3.2 | 0.88 | |||||||
CER002 | 30623 | 27255 | 1076 | 220 | -60 | 113 | 14 | 25 | 11 | 7.1 | 0.91 |
31 | 43 | 12 | 7.7 | 0.69 | |||||||
CER003 | 30566 | 27311 | 1095 | 220 | -60 | 146 | 3 | 15 | 12 | 7.7 | 0.49 |
CER004 | 30525 | 27395 | 1076 | 220 | -60 | 114 | 29 | 36 | 7 | 4.5 | 0.53 |
CER006 | 30661 | 27234 | 1074 | 220 | -60 | 75 | 28 | 36 | 8 | 5.1 | 0.68 |
39 | 46 | 7 | 4.5 | 0.45 | |||||||
CER007 | 30614 | 27301 | 1076 | 220 | -60 | 135 | 2 | 4 | 2 | 1.3 | 1.04 |
50 | 52 | 2 | 1.3 | 0.7 | |||||||
CER008 | 30569 | 27394 | 1068 | 220 | -60 | 133 | 0 | 2 | 2 | 1.3 | 1.09 |
CORPORATE
As at 31 March 2012, cash and liquid assets were US$153.9M (December quarter: $144.3M). Cash and bullion on hand represented US$99.2M of that balance - including the cash reserves of Filminera Resources Corporation. This was after having paid the interest and principal repayment on the BNP arranged project finance facility for the March quarter of US$4.4M. The outstanding project finance facility has now reduced to US$31.4M at 31 March 2012 (December quarter: $35.5M). During the quarter, the remaining 4.25M outstanding options due to expire on 31 March 2012 were exercised for total gross proceeds of A$2,762,500. At 31 March 2012, the Company had 6,521,250 options on issue and the total issued capital was 337,725,726 fully paid ordinary shares. During the March quarter, CGA's largest shareholder, Franklin Resources, Inc. and its affiliates, increased their relative interest in CGA from 9.0% by 4,540,750 shares to 34,608,750 shares, or 10.2%.
ABOUT CGA MINING LIMITED
CGA is listed on the main board of the Toronto Stock Exchange and ASX. The Masbate Gold Project in the Philippines was successfully constructed with first gold poured mid 2009. The project has a total indicated resource base of 4.55M ounces of gold, total inferred resource base of 3.22M ounces of gold and a probable reserve of 3.03M ounces of gold.
The 4Mtpa designed plant was constructed by Leighton Contractors Asia Limited ("Leighton") without one lost time injury. The mining contract for the Masbate Gold Project has been awarded to Leighton, the largest mining contractor in the world. CGA has completed a US$15M investment program designed to upsize throughput to 6.5Mtpa at Masbate. The project is forecast to produce at a rate of over 200,000 ounces per annum (year ended 30 June 2011: 190,033 ounces).
CGA has an aggressive exploration strategy. It is planned to undertake in excess of 100,000m of drilling at a cost of US$20M over the next twelve months.
CGA has a disciplined acquisition program focused on acquiring new gold projects with a substantial initial resource with the capacity to grow materially and where the development and operational experience of CGA can be applied to enhance shareholder value.
NATIONAL INSTRUMENT 43-101 AND JORC COMPLIANCE
Mr Mark Turner, BE Min(Hons), M.Aus.I.M.M.CP Man, CGA's Chief Operating Officer, is acting as the Qualified Person in compliance with NI 43-101 and JORC reporting requirements with respect to this announcement. He has prepared and or supervised the preparation of the scientific or technical information in this announcement and confirms compliance with NI43-101 and JORC requirements.
Further information relating to the Masbate Project is included in the technical report entitled Technical Report on the Mineral Resources of the Masbate Deposit, Masbate Province, Republic of the Philippines for CGA Mining Limited prepared by Mining Associates Pty Ltd and available on SEDAR at sedar.com, lodged 8 July 2008.
Andrew James Vigar of Mining Associates Pty Ltd, a qualified person, has verified the resource statement for the Masbate Project as disclosed in this announcement, including sampling, analytical and test data underlying the estimate. Verification of the data included numerous site visits, database validation of historical drill results and review of sampling and assaying protocols. The qualified person was satisfied with the verification process.
A NI 43-101 compliant report has been lodged on sedar.com verifying and supporting the new reserve statement made for the Masbate Project. Mr Daniel Tuffin, previously of Lower Quartile Solution Pty Ltd, a qualified person, has verified the reserve statement for the Masbate Project as disclosed in this announcement, including sampling, analytical and test data underlying the estimate. Verification of the data included database validation of historical drill results and review of sampling and assaying protocols. The qualified person was satisfied with the verification process.
CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS
This announcement includes certain "forward-looking statements" within the meaning of Canadian securities legislation. All statements, other than statements of historical fact, included herein including, without limitation, statements regarding milestones related to the Masbate Gold Project, production estimates and CGA's future operating or financial performance, are forward-looking statements. Forward-looking statements involve various risks and uncertainties and are based on certain factors and assumptions. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from CGA's expectations include uncertainties related to fluctuations in gold and other commodity prices and currency exchange rates; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs, recovery rates, production estimates and estimated economic return; the need for cooperation of government agencies in the development of CGA's mineral projects; the need to obtain additional financing to develop CGA's mineral projects; the possibility of delay in development programs or in construction projects and uncertainty of meeting anticipated program milestones for CGA's mineral projects; and other risks and uncertainties disclosed under the heading "Risk Factors" in CGA's Annual Information Form for the year ended 30 June 2011 filed with the Canadian securities regulatory authorities on the SEDAR website at sedar.com.
PDF with caption: "FRC-NEAR MINE EXPLORATION DRILLING HOLES TO DATE". PDF available at: http://stream1.newswire.ca/media/2012/04/16/20120416_C5768_DOC_EN_12332.pdf
Australian Contact
President & CEO - Michael Carrick
Tel: +61 8 9263 4000
Fax: +61 8 9263 4020
Email: [email protected]
US Contact
Independent Chairman - Mark Savage
Tel: +1 505 344 2822
Fax: +1 505 344 2922
Email: [email protected]
Share this article