Compliance Energy 2009 drill program at Raven successful
In the 42 drill holes completed, a total of 9899 meters was drilled and coal was intersected in all but one of the 42 holes. In drill hole RAV-09-025 the lower seams were displaced due to faulting. There are two seams of economic interest,(1.5 metres or greater) Seam 1 and Seam 3, and they have been intercepted at various depths in thicknesses ranging from 1.0 to 7.4 meters for Seam 1 and 0.65 to 5.35 meters for Seam 3 excluding partings material. (Note: all thicknesses represent drill intersected thickness and have not been corrected to true thickness). All of the hole locations are shown on attached Figure 1 "Drill Hole Location Map": http://files.newswire.ca/812/CEC_-_Figure_1.doc.
Raven Underground Coal Project Summer 2009 Drill Program Table Drillhole Seam 1 Seam 3/3 Upper* -------------------------------------------------------------------- Coal Intersection Depth Coal Intersection Depth -------------------------------------------------------------------- Coal Seam Coal Seam Thickness Thickness From (m) To (m) (m) From (m) To (m) (m) -------------------------------------------------------------------- RAV-06-009 201.95 203.85 1.90 167.20 168.50 1.30 -------------------------------------------------------------------- RAV-06-010 130.10 132.20 2.10 96.25 97.40 1.15 -------------------------------------------------------------------- RAV-06-011 444.20 447.80 3.60 426.00 427.80 1.80 -------------------------------------------------------------------- RAV-09-001 54.30 57.70 3.40 4.20 6.20 2.00 -------------------------------------------------------------------- RAV-09-002 357.25 359.00 1.75 330.10 332.10 2.00 -------------------------------------------------------------------- RAV-09-003 12.40 16.50 4.10 - - - -------------------------------------------------------------------- RAV-09-004 221.50 224.75 3.25 133.80 135.75 1.95 -------------------------------------------------------------------- RAV-09-005 311.00 313.15 2.15 282.75 285.55 2.65/ 2.80(xx) -------------------------------------------------------------------- RAV-09-006 97.75 101.55 3.80 - - - -------------------------------------------------------------------- RAV-09-007 190.30 194.60 4.30 162.50 163.55 1.05 -------------------------------------------------------------------- RAV-09-008 225.90 229.25 3.35 200.55 202.25 1.70 -------------------------------------------------------------------- RAV-09-009 212.00 214.50 2.50 185.75 188.80 3.05 -------------------------------------------------------------------- RAV-09-010 117.40 121.65 4.25 95.55 96.95 1.40 -------------------------------------------------------------------- RAV-09-011 31.75 35.55 3.80 - - - -------------------------------------------------------------------- RAV-09-012 272.98 276.00 3.24/ 5.35/ 3.62(xx) 236.10 241.05 6.7(xx) -------------------------------------------------------------------- RAV-09-013 331.30 334.50 2.95/ 308.55 310.75 1.95/ 3.2(xx) 2.20(xx) -------------------------------------------------------------------- RAV-09-014 58.05 60.40 2.35 26.30 29.90 3.60 -------------------------------------------------------------------- RAV-09-015 302.35 306.35 4.00 279.35 282.45 3.10 -------------------------------------------------------------------- RAV-09-016(1) 360.00 361.00 1.00 334.85 338.55 2.875/ 3.70(xx) -------------------------------------------------------------------- RAV-09-017 335.75 339.00 3.25 306.65 308.80 2.15 -------------------------------------------------------------------- RAV-09-018 27.60 32.10 4.50 -------------------------------------------------------------------- RAV-09-019 367.60 370.00 2.40 342.05 343.90 1.85 -------------------------------------------------------------------- RAV-09-020 329.25 331.05 1.80 296.80 300.10 3.30 -------------------------------------------------------------------- RAV-09-021 ND ND ND 357.65 359.60 170/ 1.95 -------------------------------------------------------------------- RAV-09-022 161.25 163.25 2.00 138.00 139.50 1.50 -------------------------------------------------------------------- RAV-09-023 186.50 187.80 1.30 137.68 139.50 1.82 -------------------------------------------------------------------- RAV-09-024 205.60 208.50 2.75/ 1.35/ 2.90(xx) 177.25 180.60 3.35(xx) -------------------------------------------------------------------- RAV-09-025 LS LS LS LS LS LS -------------------------------------------------------------------- RAV-09-026 69.10 70.80 1.55/ 1.70(xx) 22.85 25.35 2.50 -------------------------------------------------------------------- RAV-09-027 147.38 154.80 7.42 113.74 114.68 0.94 -------------------------------------------------------------------- RAV-09-028 479.40 482.55 2.56/ 3.15(xx) 465.60 467.27 1.67 -------------------------------------------------------------------- RAV-09-029 372.85 375.60 2.05/ 2.40/ 2.75(xx) 348.30 351.20 2.90(xx) -------------------------------------------------------------------- RAV-09-030 65.15 66.75 1.60 36.20 37.35 1.15 -------------------------------------------------------------------- RAV-09-031 56.58 59.97 1.09/ 24.20 25.00 0.80 3.39(xx) -------------------------------------------------------------------- RAV-09-032 83.40 85.52 2.12 26.90 27.73 0.83 -------------------------------------------------------------------- RAV-09-033 388.13 391.50 2.87/ 1.54/ 3.37(xx) 356.63 359.30 2.76(xx) -------------------------------------------------------------------- RAV-09-034 135.91 138.57 2.42/ 2.66(xx) 111.15 111.80 0.65 -------------------------------------------------------------------- RAV-09-035 308.12 312.68 3.92/ 4.56(xx) 279.90 281.01 1.11 -------------------------------------------------------------------- RAV-09-036 CQ 61.87 64.13 2.26 29.37 31.11 1.74 -------------------------------------------------------------------- RAV-09-037 CQ 29.74 31.81 2.07 -------------------------------------------------------------------- RAV-09-038 CQ 29.96 34.33 4.37 -------------------------------------------------------------------- RAV-09-039 CQ 29.56 33.87 4.31 -------------------------------------------------------------------- Seam 3 Lower Seam 4 -------------------------------------------------------------------- Coal Intersection Depth Coal Intersection Depth -------------------------------------------------------------------- Coal Seam Coal Seam Thickness Thickness From (m) To (m) (m) From (m) To (m) (m) -------------------------------------------------------------------- RAV-06-009 - - - - - - -------------------------------------------------------------------- RAV-06-010 - - - 59.00 59.50 0.50 -------------------------------------------------------------------- RAV-06-011 - - - 393.00 394.20 1.20 -------------------------------------------------------------------- RAV-09-001 7.80 9.50 1.70 - - - -------------------------------------------------------------------- RAV-09-002 332.70 333.65 0.95 254.50 255.30 0.80 -------------------------------------------------------------------- RAV-09-003 - - - - - - -------------------------------------------------------------------- RAV-09-004 - - - - - - -------------------------------------------------------------------- RAV-09-005 - - - 248.95 250.25 1.30 -------------------------------------------------------------------- RAV-09-006 - - - - - - -------------------------------------------------------------------- RAV-09-007 - - - 123.50 125.25 1.75 -------------------------------------------------------------------- RAV-09-008 - - - 161.40 163.60 2.20 -------------------------------------------------------------------- RAV-09-009 - - - 151.50 152.20 0.70 -------------------------------------------------------------------- RAV-09-010 97.20 97.35 0.15 53.20 54.70 1.50 -------------------------------------------------------------------- RAV-09-011 - - - - - - -------------------------------------------------------------------- RAV-09-012 - - - 200.10 201.30 1.20 -------------------------------------------------------------------- RAV-09-013 - - - 272.15 273.30 1.00/ 1.15(xx) -------------------------------------------------------------------- RAV-09-014 - - - - - - -------------------------------------------------------------------- RAV-09-015 - - - 237.50 238.20 0.70 -------------------------------------------------------------------- RAV-09-016(1) - - - 298.00 299.40 1.15/ 1.40(xx) -------------------------------------------------------------------- RAV-09-017 - - - 272.90 274.00 1.10 -------------------------------------------------------------------- RAV-09-018 -------------------------------------------------------------------- RAV-09-019 345.10 345.92 0.82 309.30 310.10 0.80 -------------------------------------------------------------------- RAV-09-020 261.00 261.80 0.80 -------------------------------------------------------------------- RAV-09-021 321.25 323.15 1.90 -------------------------------------------------------------------- RAV-09-022 140.75 141.75 1.00 119.85 120.75 0.90 -------------------------------------------------------------------- RAV-09-023 55.50 56.85 1.15/ 1.35(xx) -------------------------------------------------------------------- RAV-09-024 145.75 146.95 1.20 -------------------------------------------------------------------- RAV-09-025 -------------------------------------------------------------------- RAV-09-026 25.70 26.55 0.85 -------------------------------------------------------------------- RAV-09-027 -------------------------------------------------------------------- RAV-09-028 442.36 443.68 1.32 -------------------------------------------------------------------- RAV-09-029 312.65 313.60 0.95 -------------------------------------------------------------------- RAV-09-030 -------------------------------------------------------------------- RAV-09-031 -------------------------------------------------------------------- RAV-09-032 -------------------------------------------------------------------- RAV-09-033 311.61 312.73 1.02/ 1.12(xx) -------------------------------------------------------------------- RAV-09-034 73.84 75.00 1.16 -------------------------------------------------------------------- RAV-09-035 281.42 284.84 2.90/ 3.47(xx) -------------------------------------------------------------------- RAV-09-036 CQ -------------------------------------------------------------------- RAV-09-037 CQ -------------------------------------------------------------------- RAV-09-038 CQ -------------------------------------------------------------------- RAV-09-039 CQ -------------------------------------------------------------------- * Note: Where seam 3U & 3L are not well defined the interval is Seam 3 and is correlated with Seam U pending further study. (xx) Coal Seam thickness excluding partings/including partings. (1) No geophysical log for Seam 1. Picks from core log ND - Not determined. Hole aborted prior to intersecting seam 1 LS - Note: Lower Seams displaced by faulting
The cores samples have been sent to Birtley Coal & Minerals Testing Division of GWIL Industries in
Further to the drill program, Compliance hired AMEC Earth and Environmental to prepare an environmental assessment on the project. AMEC has initiated its environmental baseline monitoring and has crews in the field monitoring or carrying out archaeological, fish and wildlife, vegetation, hydrogeological and hydrological surveys. AMEC are currently preparing the environmental assessment Application Information Requirements ("AIR") which will be submitted to the government prior to year end. The "AIR" will outline the specific information and studies that will be provided in the Environmental Assessment Certificate Application which is targeted for submission in the 2nd Quarter of 2010.
The drilling and coal quality program is under the supervision of Owen R. Cullingham, P. Geo., who is the Independent Qualified Person for reporting purposes as defined in NI 43 - 101 Standards of Disclosure for Mineral Projects.
About Compliance Energy Corporation
Compliance Energy Corporation is a coal exploration and development company with an interest in over 75,000 acres of coal and mineral rights on
On behalf of the Board of COMPLIANCE ENERGY CORPORATION John Tapics Chief Executive Officer Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the Policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release
Note: This release contains forward-looking statements that involve risks and uncertainties. These statements may differ materially from actual future events or results. Readers are referred to the documents, filed by the Company on SEDAR at www.sedar.com, specifically the most recent reports which identify important risk factors that could cause actual results to differ from those contained in the forward-looking statements. The Company undertakes no obligation to review or confirm analysts' expectations or estimates or to release publicly any revisions to any forward-looking statements.
For further information: Greg Werbowski, Investor Relations or Rod Shier, CFO at (604) 689-0489
Share this article