Highlights include new zone of mineralization extension returning 1.83 g/t Au over 7 m – extending mineralization 200 m along strike
VANCOUVER, BC, Feb. 22, 2024 /CNW/ - First Mining Gold Corp. ("First Mining" or the "Company") (TSX: FF) (OTCQX: FFMGF) (FRANKFURT: FMG) is pleased to announce continued positive results from the 2023 diamond drilling program at its Duparquet Gold Project ("Duparquet Project" or the "Project") located in Quebec, Canada. In addition, the Company has commenced mobilization activities in support of its 2024 drilling campaigns.
First Mining's 2023 exploration strategy and maiden drill program on the Project was focused on derisking, validating and testing exploration targets that could unlock meaningful expansion opportunities along strike and down plunge of existing deposits. The Company completed 17 exploration drill holes totalling 6,966 m in its 2023 exploration drilling campaign and all assay results have now been received.
Results from the 2023 exploration campaign have defined several significant discovery and follow-up targets, including a new zone immediately to the south of the current mineral resource area (Buzz Zone: 6.52 g/t Au over 4.6 m), confirmation of mineralization and a higher grade trend in the area of Central Duparquet (CDHG Zone: 2.73 g/t Au over 6.15 m), extension and connectivity of the mineralization between Central Duparquet and the Dumico deposit (Valentre Zone: 1.71 g/t Au over 8.9 m) and most recently, advancing the easterly and down-dip extension of the Donchester South Shear Zone (DCD Zone: 1.83 g/t Au over 7.0 m).
"With our initial drill programs, First Mining has demonstrated an ability to define new gold zones in addition to significantly extend the known limits of the mineralized structures of the Duparquet Gold Project," stated Dan Wilton, CEO of First Mining. "We are excited to continue advancing the Duparquet Gold Project with additional expansion drilling, while also drill testing other significant exploration targets that exist on this large land package. With a positive PEA released last year, the success in our drilling program will continue to enhance and unlock the potential of this district-scale project located in the heart of the prolific Abitibi gold belt."
Highlights of the remaining holes from the 2023 drill program are presented in Table 1, with results for the entire 2023 drill program listed in Table 2. Drill hole locations from the 2023 program are included in Table 3.
2024 Duparquet Exploration Program Outlook
The aim of the 2024 program at the Duparquet Project is to build on the successes and learnings of the 2023 campaigns, with a continued focus on growth opportunities within the current mineral resource, as well as targeting additional Abitibi mineralization styles that carry a potential for higher-grade settings and favour regional processing synergies.
Drilling is commencing in February 2024 where the objective is to complete the Phase 2 winter drilling component of the program. A six-hole, 2,500 m drill program is planned, targeting the North Zone as well as a regional brownfields opportunity from the 2023 field campaign that remains underexplored.
For the second quarter of 2024, the Company is aiming to commence a Phase 3 drilling campaign alongside regional airborne geophysics and LiDAR survey programs that will further uplift exploration target development and vectoring ahead of the summer field campaigns.
Table 1: Selected Significant Drill Intercepts from Remainder of 2023 Drill Program
Hole ID
From (m)
To (m)
Length (m)
Grade (Au g/t)
Target
DUP23-010
91.0
98.0
7.0
1.83
DCD on Donchester South
including
91.0
92.2
1.2
2.19
and including
94.0
97.0
3.0
2.99
DUP23-011
94.3
99.1
4.8
2.46
Donchester South
including
94.3
95.9
1.6
5.16
Donchester South
DUP23-012
374.0
384.0
10.0
0.96
Donchester South (Zone 3)
DUP23-013
138.0
139.0
1.0
8.82
Other
and
270.0
286.0
16.0
0.53
Zone 3
and
303.0
309.0
6.0
1.52
RWRS Zone
DUP23-015
69.0
71.0
2.0
1.41
SID
*Reported intervals are drilled core lengths (true widths are estimated at 75-85% of the core length interval, except for hole DUP-23-013 which is estimated at 65%; assay values are uncut)
Discussion of Latest Results
Hole DUP23-010 was drilled along the mineralized shear zone at the southern contact of the Beattie Syenite body and approximately 200 m to the east of the current resource wireframe and outside of the PEA pit shell (Figure 1). The hole intersected 1.83 g/t Au over 7.0 m from 91.0 m to 98.0 m, including 2.19 g/t Au over 1.2 m and 2.99 g/t Au over 3.0 m (Table 1). The mineralization intersected is shallow in nature, at a depth of 80 m below surface, and is associated with intermixed syenite and basalts. Historical drilling in the area supports the extension of the mineralization 250 m below DUP23-010 (Figure 2). This mineralized intercept is from the most easterly hole along the historically mined Donchester South Zone, and this mineralized structure and zone remains open to the east and at depth and defines a zone for further characterization and targeting as it has the potential to add meaningful ounces to the known mineral resource.
Other significant intersections from the latest drilling include 2.7 g/t Au over 3.4 m and 2.46 g/t Au over 4.8 m, including 5.16 g/t Au over 1.6 m in drill hole DUP23-011, as well as 0.96 g/t Au over 10.0 m and 1.1 g/t Au over 6.0 m in drill hole DUP23-012 (Table 2 and Figure 3). The near-surface results from DUP23-011 confirm the up-dip extension of the historically mined Donchester South Zone. The assays returned support further investigation of opportunities to add additional ounces (defining new wireframes) as the intercepts are beyond the limits of the current PEA pit shell. Drill hole DUP23-012 confirms the continuity at depth of the Zone 3 wireframe.
Drill hole DUP23-013 targeted a large, untested area associated with Zone 3 near the junction of the previous Beattie and Donchester claim blocks. Multiple mineralized intervals were intersected, including 8.82 g/t Au over 1.0 m, 1.21 g/t Au over 6.0 m, 0.53 g/t Au over 16.0 m and 1.52 g/t Au over 6.0 m (Table 2), with the majority of these intersections located below the interpreted PEA pit shell limits (Figure 4). The mineralization in some areas spans widths thicker than previously projected and overall the mineralization remains open at depth and to the east for several hundred metres.
A new brownfields exploration target, SID, located to the north of Dumico on the boundary of the Porcupine East property, was drill tested in 2023. The SID target is located in a lithological setting outside of the traditional Beattie syenite host and is defined by a combination of historical grab samples and a drilling trend proximal to historical property boundaries. A sheared, iron carbonate mafic volcanic historical surface grab sample returned 3.3 g/t Au and was validated in First Mining's 2023 field campaign, with assays from grab samples ranging from 0.26 to 1.78g/t Au within sheared ankerite altered basalt. Historical drill hole G-83-2 was also completed in this target area and returned 2.33 g/t Au over 11. 8 m at a downhole depth of 22.7 m. First Mining drilled two exploration holes in 2023 (DUP23-014 and DUP23-015), targeting an opportunity to intersect the historical interval at a further depth than previously tested (Figure 5). Both drill holes intersected sulphide mineralization and a significant amount of quartz veining (spanning over 4.5 metres) associated with felsic tuffs and basalts interbedded with local graphitic argillites. Drill hole DUP23-014 returned 1.0 g/t Au over 1.0 m and drill hole DUP23-015 returned 1.41 g/t Au over 2.0 m (Table 2). Follow-up field work and modelling of the drill results will be a focus of this area in 2024 to better define this brownfields target.
"The ability to demonstrate additional mineralization host settings and styles is an important factor for our exploration team seeking to make new discoveries," stated James Maxwell, VP Exploration and Project Operations. "As our programs work to open up the exploration space surrounding Duparquet, we are continually met with positive validation for our efforts and encounter new opportunities supporting and growing the regional gold endowment."
Drill holes DUP23-016 and DUP23-017 were drilled to test the western extension of the historically mined West Zone on the Beattie property. Hole DUP23-016 was abandoned due to thicker than expected overburden, while DUP23-017 successfully cased through the overburden before collaring into the favourable sheared basalt and syenite porphyries. Significant gold mineralization was not returned in assay, however drilling of the hole was instrumental in identifying the target shear zone providing an open vector for exploration to the west.
2023 Duparquet Drilling Program Overview
First Mining commenced an exploration campaign in 2023 that drill tested an array of targets across the main Project area (Figure 6). The campaign focused on two main strategies; firstly, derisking the resource through validation whilst expanding on resource growth and optimization opportunities, and secondly, unlocking the geoscientific understanding of the Project to define opportunities outside of the known resource areas.
Results from the 2023 campaign support the growth potential of the Duparquet Project and the confirmation of new zones and targets, near the resource as well as more regional brownfields opportunities, demonstrating a strategy that has potential to deliver further success to First Mining.
Table 2: Drill Highlights (All 2023 Holes)
Hole ID
From (m)
To (m)
Length (m)
Grade (Au g/t)
DUP23-001
259.5
264.6
5.05
2.28
and
365.2
375
9.8
0.96
DUP23-002
44
47
3
0.96
and
106
112.3
6.3
2.72
and
125.75
146
20.25
0.74
and
354
357.3
3.3
8.70
inc.
354
355
1
18.80
and inc.
356.3
357.3
1
9.20
and
420
432
12
0.94
and
450.8
455.4
4.6
6.52
inc.
452.6
454.4
1.8
12.82
and inc.
453.5
454.4
0.9
18.60
and
582
592.4
10.4
1.19
inc.
587.8
588.5
0.7
3.97
DUP23-003
60.5
65.5
5
6.08
inc.
60.5
61.5
1
11.80
and inc.
63.5
64.5
1
15.00
and
136
158.4
22.4
1.09
inc.
137.8
138.3
0.5
13.10
and
266.2
267
0.8
7.07
and
378.85
386.6
7.75
3.47
inc.
380.3
382
1.7
10.79
and
659
660
1
4.94
and
715.5
717
1.5
2.16
DUP23-004
601
601.66
0.66
1.63
DUP23-005
292
296
4
1.78
and
306
312.15
6.15
2.73
inc.
310.3
311
0.7
6.98
and inc.
311.5
312.15
0.65
10.60
DUP23-006
79.5
82
2.5
2.07
inc.
80
80.5
0.5
5.96
and
118
121
3
1.82
and
304.6
313.5
8.9
1.71
inc.
305.5
306.5
1
5.11
and
353.9
355.9
2
2.57
inc.
353.9
354.9
1
4.72
and
363.8
371.4
7.6
1.29
inc.
369.6
371.4
1.8
3.33
DUP23-007
115
119.5
4.5
1.34
and
161.5
165.3
3.8
1.01
and
418.5
423.6
5.1
1.16
DUP23-008
235
238
3
2.04
and
243
254
11
2.83
inc.
250
253
3
4.40
DUP23-009
No significant assay results
DUP23-010
91
98
7
1.83
inc.
91
92.2
1.2
2.19
and inc.
94
97
3
2.99
DUP23-011
42.5
45.9
3.4
2.70
inc.
42.5
44
1.5
5.25
and
94.3
99.1
4.8
2.46
inc.
94.3
95.9
1.6
5.16
and inc.
97.6
98.4
0.8
2.96
DUP23-012
48
50
2
2.50
and
155.5
158.5
3
1.79
inc.
155.5
157
1.5
2.90
and
374
384
10
0.96
inc.
377
378
1
3.25
and
393
401
8
0.57
and
405
411
6
1.10
DUP23-013
138
139
1
8.82
and
257
263
6
1.21
inc.
257
259
2
2.62
and
270
286
16
0.53
inc.
284
286
2
1.18
and
303
309
6
1.52
DUP23-014
265
266
1
1.00
DUP23-015
69
71
2
1.41
DUP23-016
Hole abandoned in overburden at 45m with no core recovery
DUP23-017
No significant assay results
*Reported intervals are drilled core lengths (true widths are estimated at 75-85% of the core length interval, except for hole DUP-23-013 which is estimated at 65%; assay values are uncut)
The Duparquet Project is geologically situated in the southern part of the Abitibi Greenstone Belt and is geographically located approximately 50 km north of the city of Rouyn-Noranda. The Project benefits from easy access and proximity to an existing workforce and infrastructure, including road, rail and hydroelectric grid power. The Duparquet Project totals approximately 5,800 hectares focused along an area of 19 kilometres of strike length along the prolific Destor-Porcupine Fault Zone, along with numerous mineralized splays and influential secondary lineaments. The Duparquet Project includes the past-producing Beattie, Donchester and Duquesne mines as well as the Central Duparquet, Dumico and Pitt Gold deposits. In 2023, First Mining completed a positive Preliminary Economic Assessment ("PEA") for the Project that will guide phased optimization and advancement moving forward.
Analytical Laboratory and QA/QC Procedures
All sampling completed by First Mining within its exploration programs is subject to a Company standard of internal quality control and quality assurance (QA/QC) programs which include the insertion of certified reference materials, blank materials and a level of duplicate analysis. Core samples from the 2023 drilling program at Duparquet were sent to AGAT Laboratories, with sample preparation in Val d'Or and analysis in Thunder Bay, where they were processed for gold analysis by 50 gram fire assay with an atomic absorption finish. Samples from selected holes were sent to AGAT Laboratories in Calgary, Alberta, for multi-element analysis (including silver) by inductively coupled plasma (ICP) method with a four acid digest. AGAT Laboratories systems conform to requirements of ISO/IEC Standard 17025 guidelines and meets assay requirements outlined for NI 43-101.
Qualified Person
Louis Martin, P.Geo., Senior Geologic Consultant of First Mining, is a "Qualified Person" for the purposes of NI 43-101 Standards of Disclosure for Mineral Projects, and has reviewed and approved the scientific and technical disclosure contained in this news release.
About First Mining Gold Corp.
First Mining is a gold developer advancing two of the largest gold projects in Canada, the Springpole Gold Project in northwestern Ontario, where we have commenced a Feasibility Study and permitting activities are on-going with a draft Environmental Impact Statement ("EIS") for the project published in June 2022, and the Duparquet Project in Quebec, a PEA-stage development project located on the Destor-Porcupine Fault Zone in the prolific Abitibi region. First Mining also owns the Cameron Gold Project in Ontario and a portfolio of gold project interests including the Pickle Crow Gold Project (being advanced in partnership with Firefly Metals Ltd.), the Hope Brook Gold Project (being advanced in partnership with Big Ridge Gold Corp.), and a large equity interest in Treasury Metals Inc.
First Mining was established in 2015 by Mr. Keith Neumeyer, founding President and CEO of First Majestic Silver Corp.
ON BEHALF OF FIRST MINING GOLD CORP.
Daniel W. Wilton Chief Executive Officer and Director
This news release includes certain "forward-looking information" and "forward-looking statements" (collectively "forward-looking statements") within the meaning of applicable Canadian and United States securities legislation including the United States Private Securities Litigation Reform Act of 1995. These forward-looking statements are made as of the date of this news release. Forward-looking statements are frequently, but not always, identified by words such as "expects", "anticipates", "believes", "plans", "projects", "intends", "estimates", "envisages", "potential", "possible", "strategy", "goals", "opportunities", "objectives", or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions.
Forward-looking statements in this news release relate to future events or future performance and reflect current estimates, predictions, expectations or beliefs regarding future events. All forward-looking statements are based on First Mining's or its consultants' current beliefs as well as various assumptions made by them and information currently available to them. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements reflect the beliefs, opinions and projections on the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable by the respective parties, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Such factors include, without limitation the Company's business, operations and financial condition potentially being materially adversely affected by the outbreak of epidemics, pandemics or other health crises, such as COVID-19, and by reactions by government and private actors to such outbreaks; risks to employee health and safety as a result of the outbreak of epidemics, pandemics or other health crises, such as COVID-19, that may result in a slowdown or temporary suspension of operations at some or all of the Company's mineral properties as well as its head office; fluctuations in the spot and forward price of gold, silver, base metals or certain other commodities; fluctuations in the currency markets (such as the Canadian dollar versus the U.S. dollar); changes in national and local government, legislation, taxation, controls, regulations and political or economic developments; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and flooding); the presence of laws and regulations that may impose restrictions on mining; employee relations; relationships with and claims by local communities, indigenous populations and other stakeholders; availability and increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development; title to properties.; and the additional risks described in the Company's Annual Information Form for the year ended December 31, 2022 filed with the Canadian securities regulatory authorities under the Company's SEDAR+ profile at www.sedarplus.ca, and in the Company's Annual Report on Form 40-F filed with the SEC on EDGAR.
First Mining cautions that the foregoing list of factors that may affect future results is not exhaustive. When relying on our forward-looking statements to make decisions with respect to First Mining, investors and others should carefully consider the foregoing factors and other uncertainties and potential events. First Mining does not undertake to update any forward-looking statement, whether written or oral, that may be made from time to time by the Company or on our behalf, except as required by law.
Cautionary Note to United States Investors
The Company is a "foreign private issuer" as defined in Rule 3b-4 under the United States Securities Exchange Act of 1934, as amended, and is eligible to rely upon the Canada-U.S. Multi-Jurisdictional Disclosure System, and is therefore permitted to prepare the technical information contained herein in accordance with the requirements of the securities laws in effect in Canada, which differ from the requirements of the securities laws currently in effect in the United States. Accordingly, information concerning mineral deposits set forth herein may not be comparable with information made public by companies that report in accordance with U.S. standards.
Technical disclosure contained in this news release has not been prepared in accordance with the requirements of United States securities laws and uses terms that comply with reporting standards in Canada with certain estimates prepared in accordance with NI 43-101.
NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning the issuer's material mineral projects.
Share this article