CALGARY, Dec. 2, 2014 /CNW/ - Imperial today confirmed that bitumen production has ramped up to pre-shutdown levels at its Kearl operations following a precautionary shutdown in early November, prompted by the detection of a vibration issue with the plant's ore-crusher unit.
SOURCE: Imperial Oil Limited
Investor Relations, Christine Krol, (403) 766-1105; Media Relations, Pius Rolheiser, (403) 237-2710
Share this article