VANCOUVER, BC, Nov. 1, 2022 /CNW/ - NorZinc Ltd. (TSX: NZC) (OTCQB: NORZF) (the "Company" or "NorZinc") is pleased to announce it has completed and received final approvals for all Management Plans ("MPs") from Parks Canada ("Parks"), acting in its capacity as regulator of Nahanni National Park Reserve, pertaining to the permit and license to construct the Pioneer Winter Road ("PWR"), which represents Phase 1 of the All-Season Access Road ("ASR") at the Prairie Creek Project ("Prairie Creek" or the "Project"). This approval combined with the territorial approvals received and announced by the Company on September 26, 2022, completes the permitting process for the construction of Phase 1 of the ASR, which represents the first land access to the Project in over 40 years. Currently the site is accessible only on a fly in fly out basis.
Since construction commenced in mid-October 2022, the Company has made significant progress on the PWR with initial construction performed up to kilometer 15. With the Parks approval, the construction timeline can stay on track, with kilometer 17 entering the Nahanni Park boundary. The Company is very pleased with the entire crew from Celtic Engineering and Scouten Engineering and look forward to updating stakeholders on the progress of the road as we continue construction work.
"We have spent the majority of 2022 working very closely with Parks Canada to complete and receive approvals for the Management Plans and are very pleased to receive these final approvals within the expected adjusted time frame," said Rohan Hazelton, President & CEO, NorZinc. "Since the territorial approvals received earlier in October, the Company has been making steady progress on road constructions and these approvals enable the Company to keep construction on schedule as we have been steadily approaching Park's boundary. We are pleased to have worked with Parks Canada so closely on the Management Plans to ensure the upmost stewardship with respect to the sustainable and responsible development of the Prairie Creek Project."
In parallel with ASR Phase 1 MP approvals, the Company has begun working with both territorial and federal regulatory authorities towards completion and approval for Phase 2 of construction for the ASR, which represents the final step to completion of the fully operational year-round access road to the Prairie Creek Project.
NorZinc is a TSX-listed mine development Company trading under the symbol "NZC" and on the OTCQB under the symbol "NORZF". NorZinc is focused on developing its 100%-owned high-grade zinc-silver-lead Prairie Creek Project, located in the Northwest Territories.
This news release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements relate to future events or future performance and reflect the expectations or beliefs of management of the Company regarding future events. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as "intends", "expects" or "anticipates", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would" or will "potentially" or "likely" occur. This information and these statements, referred to herein as "forward–looking statements", are not historical facts, are made as of the date of this news release and include without limitation, statements regarding the Company's expectations regarding the PWR construction timeline.
These forward–looking statements involve numerous risks and uncertainties, and actual results might differ materially from results suggested in any forward-looking statements. These risks and uncertainties include, among other things: the risk that the PWR construction does not continue on the timeline expected by management.
In making the forward-looking statements in this news release, the Company has applied several material assumptions which the Company believes to be reasonable, including without limitation, assumptions regarding PWR construction proceeding on the timeline expected by management.
Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial out-look that are incorporated by reference herein, except in accordance with applicable securities laws. We seek safe harbor.
SOURCE NorZinc Ltd.
Rohan Hazelton, President & CEO, Tel: (604) 688-2001 or Toll-free:1-866-688-2001, E-mail: [email protected], www.norzinc.com
Share this article