Partial closure on the Honoré-Mercier Bridge on May 4th, 5th, 6th Français
News provided by
Ministère des Transports, de la Mobilité durable et de l'Électrification des transportsMay 03, 2016, 17:14 ET
MERCIER, QC, May 3, 2016 /CNW Telbec/ - The ministère des Transports, de la Mobilité durable et de l'Électrification des transports wishes to inform road users that mobile work on the Honoré-Mercier Bridge will require the closure of one lane towards Montréal and then towards the south shore on May 4th, 5th and 6th between 9:00 p.m. and 4:00 a.m. A small detour, marked with signs, may be required.
In addition, between May 9th and May 29th, work on the Honoré Mercier Bridge will lead the closure of the LaSalle Boulevard between the streets Trésor-Caché and Lafleur. A small detour, marked with signs, will be offered to road users. Pedestrians and cyclists will be able to cross under the Monette Bridge.
Those interventions might be shortened or cancelled due to work progression, weather conditions or operational constraints.
Between 2016 and 2018, about $4.7 billion will be invested by the ministère des Transports, de la Mobilité durable et de l'Électrification des transports in the road network on about 2 100 construction sites throughout Québec. To plan your trips and find out about current and projected traffic hindrance, consult the Mobility Montréal section of the Québec511.info website. Respecting road signs is vital for the safety of road users and workers.
SOURCE Ministère des Transports, de la Mobilité durable et de l'Électrification des transports
Ministère des Transports, de la Mobilité durable et de l'Électrification des transports, Direction de l'Ouest-de-la-Montérégie, Phone : 450 698-3400, Toll free : 1 866 817-9848, [email protected]
Share this article