Petromin's Morningside oil prospect now on production
/NOT FOR DISTRIBUTION TO U.S. NEWS WIRE SERVICES OR DISSEMINATION IN THE U.S./
VANCOUVER, Nov. 8, 2012 /CNW/ - Petromin Resources Ltd (the "Company") is pleased to announce that it has completed construction of the battery facility at the Company's Morningside discovery well (15-23-42-28W4M). The well has now been placed on production with all equipment being powered by casing head gas. Rates of production will be announced when stabilized. Water cut is minimal. Based on the response, additional offset wells are being proposed, and can now be directionally drilled from the current surface lease containing gas pipeline and battery facility.
Morningside is a multi-zone prospect with additional targets in the Basal Quarts ( Ellerslie) formation and bypassed gas targets in the Glauconitic, Ostracod, Belly River and coalbed Methane (CBM) formations.
Petromin farmed out the drilling of its' 50% working interest at no cost to the Company whereby the Company retains a gross overriding royalty before payout , convertible to a 25% working interest after payout.
The Company retains a 50% working interest in the undrilled acreage and anticipates further development shortly.
About Petromin Resources Ltd.
Petromin is progressive international petroleum and natural gas exploration and production Company listed Tier 1 on the TSX Venture Exchange. Petromin was ranked 24th of the Top 100 Fastest Growing Companies in BC by Business in Vancouver in 2009 based on a 704% revenue increase over the previous 4 years.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SOURCE: Petromin Resources Ltd.
PETROMIN RESOURCES LTD.
1120-1090 W. Georgia St.
Vancouver, B.C. V6E 2N7
Telephone: (604) 682-8831
Fax: (604) 682-8683
Attn: Ross Gorrell
Share this article