Shares Issued: 137,431,855
THUNDER BAY, ON, Feb. 29, 2012 /CNW/ - Premier Gold Mines Limited (TSX-PG) is pleased to announce that ongoing drilling at the Company's 100% owned Trans-Canada Project in Northwestern Ontario continues to expand high-grade gold mineralization within targeted high-grade horizons including the Fortune and High Grade North (HGN) Zones. The current drill program is focused in three broad areas (eastern, middle and western) delineating and expanding several high grade horizons in advance of completing an updated (NI) 43-101 compliant resource calculation (expected to be completed in Q1/Q2 2012) and a Preliminary Economic Assessment ('PEA' - expected to be completed in mid-2012) that will consider a range of possible development options to optimize the multiple deposits that comprise Trans-Canada Project including the Hardrock, Brookbank, Key Lake and Kailey Deposits.
The Fortune and HGN Zones are comprised of multiple, en-echelon, narrow-vein vein zones located in close proximity to the historic Hardrock mine workings. The primary vein zones have now been identified over a plunge length of some 2.0 kilometres, appear to coalesce at depth, and remain open still further to the west. The Fortune and HGN Zones have characteristics similar to the high-grade past producing Little Long Lac (600,000 ounces gold produced at a grade of 11.7 g/t) and Leitch (847,900 ounces produced at a grade of 31.5 g/t) Gold Mines that are located on the Trans-Canada Project.
Drilling is following up previous intersections that include 121.0 grams per tonne gold (g/t Au) across 1.5 metres (m) - or 3.53 ounces per ton (oz/t) across 4.9 feet (ft), 147.01 g/t Au across 2.0 m (4.29 oz/t across 6.6 ft), 251.00 g/t Au across 1.0 m (7.32 oz/t across 3.3 ft), and 54.26 g/t Au across 3.0 m (1.58 oz/t across 9.8 ft), focused on maximizing high-grade resource ounces in advance of completing the PEA. Recent highlights from ongoing drilling include:
Tables 1, 2 and 3 provide a summary of new assay results from step-out and infill drilling as the program delineates mineralization within several targeted high-grade horizons. Recent interpretation suggests that previous drilling down-plunge of the Fortune Zone intersected the horizon more than 300 metres further down-plunge of the current program. These previous results include 41.49 g/t Au across 3.0 m (1.21 oz/t across 9.8 ft) in MM182D, 11.34 g/t Au across 19.5 m (0.33 oz/t across 64.0 ft) in MM172, and 10.60 g/t Au across 7.7 m (0.31 oz/t across 25.3 ft) in MM191A. Highlighted holes are profiled in Figure 1 below.
"Drilling has now extended multiple high-grade horizons over plunge lengths that measure in kilometres" stated Brian Morris, Vice-President Exploration of Premier. "The ongoing program continues to see frequent sightings of visible gold demonstrating the robust nature and consistent down plunge continuity of mineralization which should allow for us to improve the economics of the project."
Fortune Zone - Eastern Area
As illustrated in Figure 1, drilling testing the interpreted up-plunge, near-surface, expression of the Fortune Zone target has intersected multiple high-grade vein zones with highlight assays of 15.77 g/t Au across 9.0 m (0.46 oz/t across 29.5 ft), and 74.20 g/t Au across 1.5 m (2.17 oz/t across 4.9 ft). This target area is the subject of ongoing drilling. Table 1 provides highlight intercepts from the Eastern (near surface) drilling.
Table 1 - Selected Assay Results from Eastern Area
Hole-ID | UTM Coordinates (m) |
Dip/Az (degrees) |
From (m) |
To (m) |
Interval (m)* |
Grade (g/tonne) |
Interval (ft) |
Grade (oz/ton) |
Zone |
EP157 | 5502646N 504300E |
-58/360 | 258.0 | 259.0 | 1.0 | 14.50 | 3.3 | 0.42 | P |
EP161 | 5502929N 504901E |
20.0 | 21.0 | 1.0 | 21.70 | 3.3 | 0.63 | F | |
-60/360 | 101.0 | 102.5 | 1.5 | 74.20 | 4.9 | 2.17 | F2 | ||
213.5 | 215.0 | 1.5 | 11.70 | 4.9 | 0.34 | F1 | |||
323.4 | 324.4 | 1.0 | 8.12 | 3.3 | 0.24 | HGN2 | |||
EP163 | 5502788N 505102E |
152.0 | 153.0 | 1.0 | 25.70 | 3.3 | 0.75 | F | |
-55/360 | 184.0 | 191.5 | 7.5 | 3.45 | 24.6 | 0.10 | F2 | ||
411.5 | 413.0 | 1.5 | 13.00 | 5.0 | 0.38 | F1 | |||
EP164 | 5502929N 504901E |
-60/360 | 37.0 | 38.0 | 1.0 | 34.30 | 3.3 | 1.00 | SP |
EP165 | 5502825N 504950E |
-64/360 | 46.5 | 53.5 | 7.0 | 2.52 | 23.0 | 0.07 | SP |
240.0 | 241.0 | 1.0 | 3.23 | 3.3 | 0.09 | F2 | |||
EP167 | 5502846N 504575E |
-60/360 | 507.2 | 508.2 | 1.0 | 31.30 | 3.3 | 0.91 | HGN1 |
MM244 | 5502820N 504500E |
84.2 | 85.5 | 1.3 | 94.50 | 4.3 | 2.76 | SP | |
-65/360 | 155.5 | 156.7 | 1.2 | 12.60 | 3.9 | 0.37 | F | ||
219.0 | 220.0 | 1.0 | 15.10 | 3.3 | 0.44 | F | |||
366.0 | 367.0 | 1.0 | 77.20 | 3.3 | 2.25 | F2 | |||
MM247 | 5502715N 504400E |
-63/360 | 477.0 | 478.0 | 1.0 | 14.2 | 3.3 | 0.41 | F2 |
MM251 | 5502849N 504825E |
-65/360 | 233.0 | 235.9 | 2.9 | 9.1 | 9.5 | 0.27 | F2 |
MM252 | 5502775N 504401E |
-64/360 | 193.0 | 209.0 | 16.0 | 10.68 | 52.5 | 0.31 | F |
368.0 | 376.0 | 9.0 | 15.77 | 29.5 | 0.46 | F2 | |||
* Horizontal widths of zone are 60-80% of drilled intervals |
Fortune Zone - Middle Area
The Fortune Zone was initially drill tested by Premier between the 400-600 metre levels of the historic Hardrock Mine, to assess the down-dip potential of a high-grade stringer zone that was evaluated, but not mined, on the 7th Level of the mine (at some 325 metres depth). This deeper Middle Area drilling continues to intersect multi-ounce gold intercepts and several drills are now focused on delineating this horizon.
Multiple high-grade vein zones continue to suggest excellent potential for significant gold mineralization. Recent assay results include 255.00 g/t Au across 1.0 m (7.45 oz/t across 3.3 ft), 30.50 g/t Au across 1.0m (0.89 oz/t across 3.3 ft, and 5.26 g/t Au across 8.1m (0.15 oz/t across 26.6 feet). This zone remains wide open for expansion and is the subject of ongoing drilling. Table 2 provides highlight intercepts from Middle Area drilling.
Table 2 - Selected Assay Results from Middle Area
Hole-ID | UTM Coordinates (m) |
Dip/Az (degrees) |
From (m) |
To (m) |
Interval (m)* |
Grade (g/tonne) |
Interval (ft) |
Grade (oz/ton) |
Zone |
MM236 | 5502626N 504251E |
268.8 | 272.0 | 3.2 | 3.08 | 10.5 | 0.09 | SP | |
309.0 | 310.5 | 1.5 | 5.20 | 4.9 | 0.15 | P | |||
410.5 | 422.5 | 12.0 | 2.12 | 39.4 | 0.06 | F | |||
-58/360 | 498.0 | 499.0 | 1.0 | 255.00 | 3.3 | 7.45 | F2 | ||
579.5 | 581.0 | 1.5 | 6.81 | 4.9 | 0.20 | F1 | |||
623.0 | 624.0 | 1.0 | 9.67 | 3.3 | 0.28 | HGN2 | |||
752.4 | 753.4 | 1.0 | 12.70 | 3.3 | 0.37 | HGN1 | |||
MM237A | 5502551N 504050E |
460.8 | 461.8 | 1.0 | 9.37 | 3.3 | 0.27 | P | |
-65/360 | 743.3 | 744.3 | 1.0 | 11.70 | 3.3 | 0.34 | F2 | ||
781.5 | 783.5 | 2.0 | 6.87 | 6.6 | 0.20 | F1 | |||
MM239A | 5502599N 504149E |
-68/360 | 415.7 | 416.7 | 1.0 | 64.50 | 3.3 | 1.88 | P |
MM241 | 5502648N 504050E |
422.0 | 425.0 | 3.0 | 5.27 | 9.8 | 0.15 | F | |
448.0 | 449.8 | 1.8 | 8.19 | 5.9 | 0.24 | F | |||
535.0 | 543.1 | 8.1 | 5.26 | 26.6 | 0.15 | F2 | |||
-64/360 | 548.0 | 550.0 | 2.0 | 6.84 | 6.6 | 0.20 | F2 | ||
655.5 | 657.0 | 1.5 | 8.51 | 4.9 | 0.25 | F1 | |||
771.7 | 776.9 | 5.2 | 9.89 | 19.4 | 0.29 | HGN1 | |||
MM242 | 5502599N 504200E |
-57/360 | 486.5 | 487.5 | 1.0 | 11.00 | 3.3 | 0.32 | F |
497.5 | 498.5 | 1.0 | 79.40 | 3.3 | 2.32 | F | |||
MM243 | 5502600N 503900E |
573.0 | 574.0 | 1.0 | 16.70 | 3.3 | 0.49 | F | |
613.0 | 622.0 | 9.0 | 7.09 | 29.5 | 0.21 | F2 | |||
-64/360 | 640.0 | 643.0 | 3.0 | 8.66 | 9.8 | 0.25 | SLC | ||
658.0 | 662.0 | 4.0 | 10.91 | 13.1 | 0.32 | SLB | |||
677.5 | 679.0 | 1.5 | 7.50 | 4.9 | 0.22 | F1 | |||
MM250 | 5502633N 503950E |
625.5 | 626.5 | 1.0 | 14.70 | 3.3 | 0.43 | SLC | |
-65/360 | 652.0 | 653.0 | 1.0 | 30.50 | 3.3 | 0.89 | F2 | ||
737.5 | 738.7 | 1.2 | 10.50 | 3.9 | 0.31 | F1 | |||
* Horizontal widths of zone are 60-80% of drilled intervals |
The High Grade North Zone (HGN) was discovered by Premier in 2009 immediately north of the historic mine workings and below the proposed EP-Zone open pit. The discovery hole contained appreciable visible gold and returned one of the most impressive holes ever drilled at Hardrock - 1,141.50 g/t Au across 2.0 m (33.29 oz/t across 6.6 ft). Several holes in the current drill program are being extended beyond the Fortune Zone to test the HGN Zone. Selected results from recent drilling are provided in table 2 above with assays as high as 77.20 g/t Au across 1.0 m (2.25 oz/t across 3.3 ft).
Western Area
Table 3 shown below profiles holes drill in the western end of the Hardrock deposit, at depth, where drilling within the F, SP and K Zones continues to demonstrate the robust nature of the Hardrock Deposit.
Table 3 - Selected Assay Results from Western Area
Hole-ID | UTM Coordinates (m) |
Dip/Azi (degrees) |
From (m) |
To (m) |
Interval (m)* |
Grade (g/tonne) |
Interval (ft) |
Grade (oz/ton) |
Zone |
668.5 | 670.0 | 1.5 | 46.60 | 4.9 | 1.36 | SP | |||
MM232 | 5502790 N |
-70/360 | 747.6 | 769.0 | 21.6 | 5.04 | 70.8 | 0.15 | F |
502400 E | 819.0 | 820.0 | 1.0 | 16.00 | 3.3 | 0.47 | F2 | ||
673.0 | 674.0 | 1.0 | 13.40 | 3.3 | 0.39 | SP | |||
MM233B | 5502775N |
-70/360 | 696.0 | 697.0 | 1.0 | 93.30 | 3.3 | 2.72 | P |
502550E | 944.0 | 945.5 | 1.5 | 22.40 | 4.9 | 0.65 | K | ||
MM233C | 5502775N |
-70/360 | 658.0 | 659.0 | 1.0 | 12.60 | 3.3 | 0.37 | SP |
502550E | 919.2 | 921.4 | 2.2 | 4.38 | 7.2 | 0.13 | K | ||
MM240 | 5502775N 502500E |
-68/360 | 633.4 | 634.4 | 1.0 | 6.24 | 3.3 | 0.18 | SP |
MM240A | 5502775N 502500E |
-68/360 | 681.0 | 692.5 | 11.5 | 5.47 | 37.7 | 0.16 | SP |
* Horizontal widths of zone are 60-80% of drilled intervals |
These results support management's belief that the grade of the Hardrock Deposit has upside potential that may be more fully delineated and understood with in-fill drilling eventually completed from underground platforms.
Trans-Canada Project
The Trans-Canada Project is host to several past-producing mines which collectively produced more than 4 million ounces of gold from depths primarily within 600 metres of surface between 1938 and 1968. The Hardrock Deposit is host to a (NI) 43-101 compliant mineral resource estimate that was completed by Micon International Limited earlier in 2011. An updated resource estimate is being completed utilizing final results of the 2011 drill program, and is expected to be released late in Q1 or early Q2 2012. The Trans-Canada Project benefits from development advantages with the Trans-Canada Highway, Trans-Canada Pipeline, and major power lines running through, or in close proximity to, the Project sites. Significant services and a skilled labour pool exist with several communities located in close proximity.
Stephen McGibbon, P. Geo., is the Qualified Person for the information contained in this press release and is a Qualified Person within the meaning of National Instrument 43-101. Assay results are from core samples sent to Activation Laboratories, an accredited mineral analysis laboratory in Ancaster, Ontario, or to Accurassay Laboratories, an accredited mineral analysis laboratory in Thunder Bay, Ontario, for preparation and analysis utilizing both fire assay and screen metallic methods.
Premier Gold Mines Limited is one of North America's leading exploration companies with a high-quality pipeline of gold projects focused in proven, safe and accessible mining jurisdictions in Canada and the United States. The Company's portfolio includes significant assets in world class gold mining districts such as Red Lake, Musselwhite and Geraldton in Ontario and the Carlin Trend in Nevada.
The statements made in this Press Release may contain forward-looking statements that may involve a number of risks and uncertainties. Actual events or results could differ materially from the Company's expectations and projections.
PDF with caption: "Figure 1 - Long Section of Fortune Zone Target & Potential". PDF available at: http://stream1.newswire.ca/media/2012/02/29/20120229_C8320_DOC_EN_10590.pdf
Ewan Downie, President & CEO
Phone: 807-346-1390
Fax: 807-346-0100
e-mail: [email protected]
Web Site: www.premiergoldmines.com
Share this article