Shares Issued: 201,313,187
THUNDER BAY, ON, Jan. 11, 2017 /CNW/ - PREMIER GOLD MINES LIMITED ("Premier" or "The Company") (TSX:PG) is pleased to confirm a maiden Mineral Resource estimate for the Company's 100%-owned Hasaga Property, located in Red Lake, Ontario, Canada some 440 kilometres northwest of Thunder Bay. The estimate, completed by MRB and Associates of Val-d'Or, Quebec (with an effective date of December 30th, 2016) has been completed following a two-year exploration and delineation drilling campaign by Premier that focussed on the Central, Hasaga and Buffalo target areas.
Table 1 provides a property-wide summary of the Mineral Resources at Hasaga, while Table 2 separates the Mineral Resources into respective target areas described in earlier press releases.
Highlights of the December 30th, 2016 Hasaga estimate include:
All abbreviations used in this press release are available by following this link (click here).
"Our focus on resource delineation at Hasaga has resulted in a discovery cost of less than $17.00 per indicated resource ounce" commented Premier Executive Vice-President Stephen McGibbon on the Company's C-Suite Blog (http://www.premiergoldmines.com/news/c-suite-blog). "This is the result of excellent work by our on-site team and an important first step toward assessing the future mining potential at Hasaga."
Importantly, the estimated resources are hosted within mineralization that remains open at depth. Premier will seek to increase property-wide resources by testing for potential higher grade mineralization in 2017 that may be amenable to underground mining methods.
Table 1 - Hasaga Mineral Resource Estimate (Dec 30th, 2016)
Property |
Resource |
Tonnes |
Gold Grade |
Contained Au |
Measured |
- |
- |
- |
|
Indicated |
42,294 |
0.83 |
1,124 |
|
HASAGA |
Measured + |
|||
Indicated |
42,294 |
0.83 |
1,124 |
|
Total Inferred |
25,143 |
0.78 |
631 |
The Mineral Resource estimate used the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Definition Standards for Mineral Resources and Mineral Reserves, Definitions and Guidelines prepared by CIM Standing Committee on Reserve Definitions and adopted by CIM Council on May 10, 2014. The mineral resource estimate is classified as "measured", "indicated", or "inferred" as defined by CIM.
Table 2 - Hasaga Mineral Resources by Target Area
Deposit |
Category |
Tonnes |
Gold Grade |
Contained Au |
Central Zone |
Indicated |
31,613 |
0.79 |
804 |
Inferred |
23,733 |
0.76 |
583 |
|
Hasaga Zone |
Indicated |
9,050 |
0.89 |
258 |
Inferred |
806 |
1.00 |
26 |
|
Buffalo Zone |
Indicated |
1,632 |
1.18 |
62 |
Inferred |
604 |
1.12 |
22 |
|
Total |
Indicated |
42,294 |
0.83 |
1,124 |
Inferred |
25,143 |
0.78 |
631 |
The key assumptions and parameters used in the estimate of the Mineral Resources are summarized as follows:
Table 3 is a sensitivity analysis of the of the Hasaga Property mineral resource estimate across a range of potential cut-off grades.
Table 3 Sensitivity Analysis for Hasaga Mineral Resource Estimate
Cut-off |
Category |
Tonnes |
Gold Grade |
Contained Au |
>0.90 g/t Au |
Indicated |
11,687 |
1.25 |
471 |
Inferred |
5,383 |
1.28 |
221 |
|
>0.70 g/t Au |
Indicated |
22,853 |
1.03 |
754 |
Inferred |
11,177 |
1.02 |
368 |
|
>0.50 g/t Au |
Indicated |
42,294 |
0.83 |
1,124 |
Inferred |
25,143 |
0.78 |
631 |
|
>0.30 g/t Au |
Indicated |
70,821 |
0.65 |
1,490 |
Inferred |
49,589 |
0.59 |
940 |
A comprehensive description of key assumptions and parametres used are set out in a technical report that will be available on SEDAR and Premier's website within 45 days of this press release.
Hasaga Metallurgy Summary
In December, Premier reported on a recently completed metallurgical scoping program on samples from the Hasaga, Central and Buffalo Zones with the intent to characterize the lithological and mineralization domains of the project areas, and to complement the Hasaga mineral resource estimate. Although bottle roll tests utilizing coarser crush sample composites (¼", ½", ¾" crush sizes) does not support a potential heap leach recovery process, the baseline bottle roll cyanidation study indicated very good recoveries for all grade ranges with metallurgical results of between 94% and 97% when grinding to 80% passing 200 mesh.
Investor Day
Premier will be hosting an Investor Day presentation at the Toronto Board of Trade (4th floor, rooms A/B), 1 First Canadian Place, Toronto, Ontario at 10:00am (EST) on Thursday, January 12, 2017. The Company invites all current and future shareholders to attend this event.
Abderazzak Ladidi, P.Geo and Vincent Jourdain, Eng., Ph.D. are the independent Qualified Persons who have reviewed and approved the contents of this press release for the purposes of National Instrument 43-101.
Premier Gold Mines Limited is a respected production, exploration and development company with a high-quality pipeline of gold projects focused in proven, safe, and accessible mining jurisdictions in Canada, the United States, and Mexico.
Forward Looking Information
This Press Release contains certain information that may constitute "forward-looking information" under applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, statements about the estimation of mineral resources and mineral reserves, strategic plans, including future operations, future work programs, capital expenditures, discovery and production of minerals, price of gold and currency exchange rates, timing of geological reports and corporate and technical objectives. Forward-looking information is necessarily based upon a number of assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking information, including the risks inherent to the mining industry, adverse economic and market developments and the risks identified in Premier's annual information form under the heading "Risk Factors". There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information contained in this press release is given as of the date hereof and is based upon the opinions and estimates of management and information available to management as at the date hereof. Premier disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by law.
SOURCE Premier Gold Mines Limited
Ewan Downie, President & CEO, Phone: 807-346-1390, Fax: 807-346-0100, e-mail: [email protected], Web Site: www.premiergoldmines.com
Share this article