/R E P E A T -- Bonaventure Expressway: work on September 25 and 26 -
Complete closure at Exit 2 (Pierre-Dupuy Ave.)/
LONGUEUIL, QC,
Detour routes have been planned in the area where the work will be taking place. However, motorists are invited to use the other bridges to the South Shore during the duration of the work, as well as the public transportation system.
Details of the closures: Complete closure of the Bonaventure Expressway going east (Champlain Bridge) and west (Downtown Montreal) at Exit 2 including: 1. Closure of the Wellington St. on-ramp 2. Complete closure of Pierre-Dupuy Ave. under the Bonaventure Expressway 3. Closure of one of two lanes on Pierre-Dupuy Ave. going south and on Des Irlandais Street going north
For further information, please visit the JCCBI website at www.jccbi.ca.
For further information: Jean-Vincent Lacroix, AGC Communications, (514) 849-7000, ext. 230, Cell: (514) 249-1940, [email protected]; Source: André Girard, Vice-President, Communications, The Federal Bridge Corporation, (450) 468-5775, [email protected]
Share this article