Short term closure on the Honoré-Mercier Bridge towards the South Shore Français
News provided by
Ministère des Transports, de la Mobilité durable et de l'Électrification des transportsAug 31, 2016, 15:18 ET
MERCIER, QC, Aug. 31st, 2016 /CNW Telbec/ - The ministère des Transports, de la Mobilité durable et de l'Électrification des transports wishes to inform road users that work on the slab will require the closure of the right lane of the Honoré-Mercier Bridge towards the South Shore, from Friday September 2nd at 10 p.m. to Saturday September 3rd at noon.
Those interventions might be shortened or cancelled due to work progression, weather conditions or operational constraints.
Between 2016 and 2018, about $4.7 billion will be invested by the ministère des Transports, de la Mobilité durable et de l'Électrification des transports in the road network, and there will be about 2 100 construction sites throughout Québec. To plan your trips and find out about current and projected traffic hindrance, consult the Mobility Montréal section of the Québec511.info website. Respecting road signs is vital for the safety of road users and workers.
SOURCE Ministère des Transports, de la Mobilité durable et de l'Électrification des transports
Ministère des Transports, de la Mobilité durable et de l'Électrification des transports, Direction de l'Ouest-de-la-Montérégie, Phone : 450 698-3400, Toll free : 1 866 817-9848mailto:[email protected]
Share this article