VANCOUVER, May 14, 2020 /CNW/ - SSR Mining Inc. (NASDAQ: SSRM) (TSX: SSRM) ("SSR Mining") provides an update on exploration activities and results at our Marigold mine in Nevada, U.S., Seabee Gold Operation in Saskatchewan, Canada and Puna Operations in Jujuy, Argentina for the period from June 1, 2019 to April 30, 2020 (the "Exploration Period").
Paul Benson, President and CEO said, "We are very pleased to report positive exploration results from our recent drill programs at Marigold and the Seabee Gold Operation. For 2020, we are planning significant investment in our exploration and the results reported here justify the investment.
The exploration drilling on the recently acquired Trenton Canyon property at Marigold has yielded exciting high-grade gold results from newly discovered sulphide mineralization in a geologic setting analogous to other high-grade underground gold mines in Nevada. These intercepts are just north of one of the historic pits at Trenton Canyon, and we are evaluating the impact they may have on Mineral Resources. Our work to confirm and validate Trenton Canyon's historic drill results has progressed according to plan, and we look forward to reporting Mineral Resources when reported at year-end 2020.
We continue to enjoy exploration success at Seabee with positive drill results from Santoy Gap Hanging Wall area where we are upgrading and expanding the Mineral Resources to extend Santoy's mine life. Finally, we also had encouraging exploration results on early stage targets with several holes returning high-grade gold results at Batman Lake and on the Fisher property."
Highlights:
At Marigold our Trenton Canyon exploration drilling has returned better than expected results from four holes completed 300 meters north of the South Pit in a newly discovered sulphide zone hosted by carbonaceous mudstone located immediately beneath Valmy Formation quartzite. We are evaluating the significance and impact of these sulphide intercepts which are listed below on Mineral Resources.
MRA7178 returned 5.19 g/t gold over 94.5 meters including 44.68 g/t gold over 7.6 meters and 6.68 g/t gold over 6.1 meters.
MRA7176 returned 1.98 g/t gold over 82.3 meters including 6.11 g/t gold over 13.7 meters.
MRA7148 returned 0.97 g/t gold over 99.1 meters including 4.34 g/t gold over 9.1 meters.
MRA7097 returned 1.57 g/t gold over 77.7 meters including 7.89 g/t gold over 9.1 meters and 3.85 g/t gold over 9.1 meters.
Trenton Canyon confirmation drilling for oxide mineralization also returned positive results, as highlighted below, that may contribute to our Mineral Resources estimate at year-end 2020:
MRA7141 returned 1.94 g/t gold over 50.3 meters from surface and 1.08 g/t gold over 21.3 meters as oxide plus a transitional intercept of 1.38 g/t gold over 15.2 meters.
At West Pit, drillhole MRA7092 returned 7.27 g/t gold over 30.5 meters from 274.3 meters leading to the discovery of gold mineralization that is transitional oxide.
At Relay Ridge, drillhole MR7084 returned 3.13 g/t gold over 108.2 meters from 27.4 meters including 12.73 g/t gold over 21.3 meters.
At the Seabee Gold Operation, brownfields drill results for the Santoy Gap Hanging Wall ("Gap HW") are expected to increase Mineral Resources at year-end 2020. Drill results include:
Drillhole JOY-20-914 intercepted 28.92 g/t gold over 2.62 meters extending mineralization 210 meters beyond the year end 2019 Mineral Resource limits.
Also, at Seabee, greenfields exploration intercepted a new gold mineralized zone at the Batman Lake area, where we targeted a new gold discovery. Drill results include:
Drillhole BAT-20-013 intercepted 37.95 g/t gold over 3.6 meters.
At the Fisher project, drill results for the Mac North and Yin targets intercepted visible gold occurrences, where we targeted a new gold discovery. Drill results include:
Drillhole FIS-20-053 intercepted 9.1 g/t gold over 1.92 meters
Drillhole YIN-20-004 intercepted 13.74 g/t gold over 2.29 meters, including 55.50 g/t gold over 0.53 meters.
Marigold mine, U.S.
At the Marigold mine, our exploration plan for 2020 focusses on the discovery of additional Mineral Resources south of the currently producing Mackay Pit, including Trenton Canyon, Valmy, East Basalt and Crossfire. A limited amount of reverse circulation ("RC") drilling for additional Mineral Reserves at Mackay Pit and extensions at Red Dot is underway.
With the acquisition in 2019 of adjacent claims south and west of our mining activities, such as Trenton Canyon, we nearly doubled our land position. The additional mineral claims provide latitude to systematically explore for extensions to existing near-surface oxide deposits similar to those mined at Marigold, and for higher-grade sulphide deposits associated with deep fault structures, intrusive rocks and favourable Comus Formation sedimentary rocks similar to those hosting the deposits at the near-by Turquoise Ridge Mine. Our exploration plan for high-grade, sulphide gold mineralization in 2020 includes 4,300 meters of core drilling supported by seismic and gravity geophysical surveys.
A total of 70,304 meters in 210 RC and core drillholes were completed during the Exploration Period with drill locations shown in Figures 1 and 2. Table 1 highlights mineralized intercepts from Trenton Canyon, Mackay Pit, Red Dot, East Basalt, Valmy, and Crossfire. Results at Trenton Canyon were successful on two objectives: i) we have confirmed the position and grade of historic gold-mineralized intercepts; and ii) we have discovered a new tabular zone of potentially continuous sulphide mineralization requiring further investigation. Drill results at Valmy and Trenton Canyon successfully extended gold mineralization for potential additions to Mineral Resources estimates from December 31, 2019.
At Trenton Canyon exploration drilling shown in Figure 2 includes a sulphide intercept of 5.19 g/t gold over 94.5 meters including 44.68 g/t gold over 7.6 meters and 6.68 g/t gold over 6.1 meters from drillhole MRA7178. Importantly, the drillhole ended in gold mineralization as shown in Figure 3. The mineralized interval in MRA7178 shows continuity to the next section south located 30 meters away where three drillholes all returned positive results including 1.98 g/t gold over 82.3 meters, 1.57 g/t gold over 77.7 meters and 0.97 g/t gold over 99.1 meters shown in Figure 4 in drillholes MRA7176, MRA7097, and MRA7148 respectively. The mineralized zone measures 150 meters on dip with an orthogonal thickness of 50 to 70 meters with the potential to expand as gold mineralization is open down dip to the east, and to the north of MRA7178, and to the south. These results demonstrate width and grade conditions similar to operating underground gold operations elsewhere in Nevada. As a result of ongoing positive exploration results, we will continue to test and expand this new zone of gold mineralization.
At Trenton Canyon confirmation drilling at Relay Ridge shown in Figure 2, includes 3.13 g/t gold over 108.2 meters starting at 27.4 meters from surface including 12.73 g/t gold over 21.3 meters from drillhole MR7084. In addition, we encountered 1.94 g/t gold over 50.3 meters from exploration drillhole MRA7141 with the new zone starting at surface as shown in Figure 5. Both drillholes returned zones of oxide gold mineralization similar to that mined at Marigold. Drillhole MRA7092 intercepted 7.27 g/t gold over 30.5 meters starting at 274.3 meters in transitional material, which is new, high-grade gold sulphide mineralization associated with a fault structure related to the West Pit fault, as shown in the deeper intercept in Figure 6.
Results from Valmy in the first quarter of 2020 included 0.92 g/t gold over 39.6 meters in drillhole MR7128 and 0.66 g/t gold over 50.3 meters from MR7129. These results are expected to further expand Mineral Resources at Valmy when reported at year-end 2020.
During the third and fourth quarter of 2019, we completed detailed field mapping and sampling of the Trenton Canyon area covering approximately 570 hectares surrounding the historic pits and exploration areas. We have identified the fault and stratigraphic controls to gold mineralization exploited in historic pits and have recognized several new-near surface targets. This work supports the development of targeting concepts as we explore for high-grade sulphide deposits at Trenton Canyon and Marigold.
During the Exploration Period, one core hole was completed at Trenton Canyon which encountered Lower Plate Comus Formation lithologies at 300 meters from surface. This is significant as the favourable Comus Formation sedimentary rocks can be more efficiently explored for high-grade, sulphide deposits at relatively shallow depths. The Comus Formation is the sulphide ore-hosting rock unit encountered at the high-grade Turquoise Ridge Mine.
Looking ahead, we have received approvals to build roads and construct drill sites along the identified mineralized corridors at Trenton Canyon. We anticipate moving the RC drill rigs to exploration areas in the second quarter of 2020. Core drilling is planned to follow up on sulphide mineralization intercepted in MRA7178 and MRA7092 and targets anticipated from the upcoming seismic geophysical studies. Timing to initiate this exploration activity may be impacted by State of Nevada COVID-19 quarantine restrictions.
Seabee Gold Operation, Canada
At the Santoy mine complex, drilling throughout the Exploration Period focused on increasing Mineral Resources and Mineral Reserves at the Gap HW, Santoy 8A and Santoy 9A and 9C zones, and nearby Batman Lake target. Over the Exploration Period a total of 50,114 meters of core drilling was completed in underground and surface programs in 166 holes. The locations are shown relative to the year-end 2019 Mineral Resources outlines in Figure 7 together with highlights from the Exploration Period.
The Gap HW drill program comprises two-thirds of the Seabee drilling for the Exploration Period and contributed to our Mineral Resource estimate for year-end 2019 announced on February 20, 2020. Infill and step out drilling shown in Figure 8 continued through the first quarter of 2020 leading to positive results as outlined below.
Drilling at Gap HW has identified three stacked zones (A, B and C) that occur between one and ten meters apart that are associated with quartz veining and visible gold. This mineralization has comparable processing characteristics to the ore from our Santoy mine currently being mined. Selected drillhole results include 14.75 g/t gold over 7.64 meters and 28.92 g/t gold over 2.62 meters in underground hole SUG-20-911 and surface hole JOY-20-914, respectively. Notably, the JOY-20-914 intercept is 210 meters down plunge from the nearest Inferred Mineral Resources at Gap HW, implying that Mineral Resources may extend to these depths, potentially adding 20% to the Gap HW plunge length. Table 3 presents the highlights of 47 Gap HW intercepts with gram-meter products exceeding 9.0. We expect these new first quarter 2020 results to further expand Mineral Resources at Gap HW when estimated at year-end 2020.
Infill and step-out drilling at Santoy 8A identified extensions to Mineral Resources from higher-grade intercepts including 20.14 g/t gold over 6.23 meters and 19.81 g/t gold over 5.83 meters in underground holes SUG-19-307 and SUG-19-928, respectively. These high-grade results were incorporated in the Santoy 8A Mineral Resources estimate for year-end 2019 reported on February 20, 2020. Table 3 presents selected highlights of 16 intercepts from the Exploration Period that achieved resource grade and width conditions.
Infill and step-out drilling was completed during the Exploration Period at Santoy 9A through 9C with six holes achieving Mineral Resource grade and width conditions. Two selected holes include 21.04 g/t gold over 1.57 meters in SUG-20-302 and 28.67 g/t gold over 0.73 meters in SUG-20-300. These two narrow width high-grade intercepts were received in January 2020 from Santoy 9A, which, taken together with existing infrastructure and Mineral Resources, are expected to expand Mineral Resources in the upper reaches of Santoy 9A.
The location of district-scale greenfield drilling conducted in the first quarter of 2020 is shown in Figure 9. At the Batman Lake area located 650 meters south of Santoy 8 underground workings, we tested several previously un-drilled targets and have completed 13 drill holes totaling 3,457 meters during the Exploration Period. This drilling, illustrated in Figure 10, tested the Riddler and Joker zones defined by surface soil and grab sample anomalies from the 2019 summer field program. Drillhole BAT-20-013 returned 37.95 g/t gold over 3.6 meters, including 117.20 g/t gold over 1.0 meter, from a shallow diorite-hosted sheeted quartz vein zone with minor sulphides and visible gold at the Joker target. Drill hole BAT-20-007 was drilled approximately 150 meters down plunge and intercepted 1.23 g/t gold over 1.5 meters in a 7.5-meter zone of vein quartz and diopside-actinolite altered diorite. These intercepts demonstrate the near-surface Mineral Resource potential of the Santoy mine complex proximal to existing mine infrastructure.
At the Fisher project our 2020 primary exploration objective is to discover a new zone with potential for Inferred Mineral Resources from targets developed during the 2019 summer field program. Exploration drilling during the Exploration Period focused on the Mac North, Yin, Abel Lake, and Aurora targets, where we completed 31 drill holes totaling 9,463 meters.
At Mac North we drilled 5,547 meters in 13 holes following up on drillhole FIS-19-035 that intersected 3.76 g/t gold over 4.18 meters while exploring a longitudinal section measuring 1,000 meters by 450 meters deep. Four holes explored the area adjacent to FIS-19-035 as shown in Figure 11 and encountered visible gold with one drill hole providing a resource grade and width intercept of 9.1 g/t gold over 1.92 meters in FIS-20-053. At Yin we drilled five holes over a 500-meter strike length of anomalous soil samples overlying interleaved metavolcanic rocks and diorite. Drill hole YIN-20-004 intercepted two results of 11.93 g/t gold over 0.5 meters and 13.72 g/t gold over 2.29 meters including 55.5 g/t gold over 0.53 meters requiring follow up during our summer 2020 drilling program.
Exploration activities were complete in late-March 2020 and coincided with our voluntary suspension of operations at Seabee in response to the COVID-19 pandemic. We expect to resume our Seabee and Fisher project exploration activities once a safe re-start of operations at Seabee allows for added exploration personnel on site.
Puna Operations, Argentina
In January we concluded a 3,430-meter core drill program on the Granada target at the Pirquitas property. The drilling explored the projected intersection of the historically mined, high grade Potosi vein and the Cortaderas vein breccia, which already contributes to Mineral Resources at the Pirquitas Underground area. Three holes were completed to depths ranging from 1,010 to 1,220 meters. One drill hole intercepted a near ore-grade intercept containing gold and silver over 4.3 meters at a depth of 1031.15 meters. The occurrence of elevated gold grades requires follow up as it is not historically present in Mineral Resources estimated at Pirquitas. No further work is planned on the target for 2020.
Table 1. Selected drillhole results from the Marigold mine, Nevada, U.S. for the Exploration Period.
Hole ID
From
(meters)
To
(meters)
Width
(meters)
Gold
(g/t)
Ore Type
Area
MRA6966
0.0
21.3
21.3
1.17
Oxide
Crossfire
MRA6987
0.0
67.1
67.1
0.64
Oxide
East Basalt
MRA6999
80.8
137.2
56.4
0.71
Oxide
East Basalt
(including)
82.3
91.4
9.1
2.31
Oxide
East Basalt
and
262.1
318.5
56.4
0.69
Oxide
East Basalt
MRA7003
106.7
134.1
27.4
0.77
Oxide
Crossfire
MRA7006
170.7
211.8
41.1
0.79
Oxide
Mackay Pit
(including)
189.0
199.6
10.7
2.02
Oxide
Mackay Pit
MRA7007
184.4
234.7
50.3
0.49
Oxide
Mackay Pit
MRA7008
86.9
131.1
44.2
0.74
Oxide
Mackay Pit
MRA7009
47.2
108.2
61.0
0.53
Oxide
Mackay Pit
MRA7017
71.6
132.6
61.0
1.13
Oxide
Valmy
(including)
71.6
83.8
12.2
3.98
Oxide
Valmy
MRA7019
7.6
56.4
48.8
0.85
Oxide
Crossfire
(including)
36.6
45.7
9.1
3.33
Oxide
Crossfire
MRA7020
134.1
163.1
29.0
1.11
Oxide
Crossfire
(including)
135.6
147.8
12.2
2.11
Oxide
Crossfire
MR7023
288.0
326.1
38.1
1.48
Oxide
East Basalt
(including)
292.6
301.8
9.1
4.79
Oxide
East Basalt
DDH7027
269.8
287.9
18.1
2.13
Oxide
Red Dot
and
314.3
326.0
11.7
1.84
Oxide
Red Dot
and
329.3
351.8
22.5
1.43
Oxide
Red Dot
DDH7028
384.0
408.9
24.9
1.09
Oxide
Red Dot
MR7037
184.4
214.9
30.5
0.89
Oxide
Mackay Pit
MRA7040
240.8
312.4
71.6
0.39
Sulphide
Trenton Canyon
MRA7047
152.4
169.2
16.8
1.65
Oxide
Trenton Canyon
(including)
152.4
155.4
3.0
7.69
Oxide
Trenton Canyon
DDH7050
287.4
303.9
16.5
1.69
Oxide
Red Dot
and
329.3
353.4
24.1
0.88
Oxide
Red Dot
DDH7051
280.6
313.2
32.6
4.73
Oxide
Red Dot
and
314.1
347.8
33.7
2.52
Oxide
Red Dot
DDH7052
288.6
298.8
10.2
2.70
Oxide
Red Dot
MRA7055
88.4
108.2
19.8
2.32
Oxide
Trenton Canyon
(including)
88.4
100.6
12.2
3.65
Oxide
Trenton Canyon
and
157.0
181.4
24.4
1.17
Oxide
Trenton Canyon
and
181.4
192.0
10.7
2.59
Transitional
Trenton Canyon
MRA7056
74.7
118.9
44.2
0.67
Oxide
Trenton Canyon
MRA7057
33.5
44.2
10.7
1.89
Oxide
Trenton Canyon
and
112.8
144.8
32.0
0.70
Oxide
Trenton Canyon
DDH7058
264.3
281.9
17.7
1.72
Oxide
Red Dot
DDH7059
252.2
271.3
19.1
1.08
Oxide
Red Dot
and
323.7
343.5
19.8
3.79
Oxide
Red Dot
and
348.3
357.2
8.9
3.19
Oxide
Red Dot
DDH7060
283.0
302.4
19.4
2.13
Oxide
Red Dot
MRA7063
94.5
114.3
19.8
1.53
Oxide
Trenton Canyon
MRA7064
196.6
222.5
25.9
3.62
Transitional
Trenton Canyon
(including)
198.1
214.9
16.8
5.41
Transitional
Trenton Canyon
and
274.3
306.3
32.0
1.47
Transitional
Trenton Canyon
(including)
274.3
278.9
4.6
5.96
Transitional
Trenton Canyon
MRA7083
50.3
68.6
18.3
1.32
Oxide
Trenton Canyon
MR7084
27.4
135.6
108.2
3.13
Oxide
Trenton Canyon
(including)
51.8
73.2
21.3
12.73
Oxide
Trenton Canyon
and
99.1
108.2
9.1
4.00
Oxide
Trenton Canyon
MRA7085
185.9
193.5
7.6
5.43
Transitional
Trenton Canyon
MRA7087
257.6
266.7
9.1
4.12
Sulphide
Trenton Canyon
(including)
257.6
260.6
3.0
10.68
Sulphide
Trenton Canyon
MRA7090
236.2
253.0
16.8
2.18
Oxide
Trenton Canyon
MRA7092
167.6
187.5
19.8
2.03
Transitional
Trenton Canyon
(including)
167.6
172.2
4.6
6.34
Transitional
Trenton Canyon
and
259.1
265.2
6.1
3.65
Transitional
Trenton Canyon
(including)
260.6
263.7
3.0
7.13
Transitional
Trenton Canyon
and
274.3
304.8
30.5
7.27
Transitional
Trenton Canyon
(including)
278.9
291.1
12.2
17.23
Transitional
Trenton Canyon
MRA7096
135.6
152.4
16.8
2.23
Transitional
Trenton Canyon
MRA7097
199.6
277.4
77.7
1.57
Sulphide
Trenton Canyon
(including)
202.7
211.8
9.1
7.89
Sulphide
Trenton Canyon
(including)
231.6
240.8
9.1
3.85
Sulphide
Trenton Canyon
MRA7098
198.1
259.1
61.0
0.93
Sulphide
Trenton Canyon
(including)
198.1
202.7
4.6
7.25
Sulphide
Trenton Canyon
MRA7099
44.2
82.3
38.1
0.60
Oxide
Trenton Canyon
MRA7102
376.4
417.6
41.1
0.87
Sulphide
Trenton Canyon
MRA7103
266.7
288.0
21.3
1.05
Sulphide
Trenton Canyon
MRA7115
42.7
70.1
27.4
2.09
Transitional
Trenton Canyon
(including)
42.7
57.9
15.2
3.47
Transitional
Trenton Canyon
MRA7121
108.2
170.7
62.5
0.54
Transitional
Trenton Canyon
(including)
109.7
118.9
9.1
2.44
Transitional
Trenton Canyon
MRA7126
143.3
150.9
7.6
4.84
Sulphide
Trenton Canyon
and
227.1
259.1
32.0
0.73
Sulphide
Trenton Canyon
MR7128
195.1
234.7
39.6
0.92
Oxide
Valmy
MR7129
185.9
236.2
50.3
0.66
Oxide
Valmy
MRA7135
263.7
294.1
30.5
0.85
Sulphide
Trenton Canyon
(including)
265.2
280.4
15.2
1.55
Sulphide
Trenton Canyon
MRA7136
74.7
91.4
16.8
1.21
Oxide
Trenton Canyon
and
192.0
216.4
24.4
1.97
Sulphide
Trenton Canyon
(including)
196.6
210.3
13.7
3.29
Sulphide
Trenton Canyon
MRA7141
0.0
50.3
50.3
1.94
Oxide
Trenton Canyon
(including)
25.9
41.1
15.2
5.87
Oxide
Trenton Canyon
and
97.5
118.9
21.3
1.08
Oxide
Trenton Canyon
and
182.9
198.1
15.2
1.38
Transitional
Trenton Canyon
MR7145
80.8
102.1
21.3
1.42
Sulphide
Trenton Canyon
MRA7148
237.7
336.8
99.1
0.97
Sulphide
Trenton Canyon
(including)
237.7
246.9
9.1
4.34
Sulphide
Trenton Canyon
MRA7167
192.0
210.3
18.3
1.43
Transitional
Trenton Canyon
(including)
193.5
196.6
3.0
7.55
Transitional
Trenton Canyon
MRA7171
190.5
210.3
19.8
2.28
Sulphide
Trenton Canyon
(including)
199.6
204.2
4.6
6.01
Sulphide
Trenton Canyon
MRA7176
286.5
368.8
82.3
1.98
Sulphide
Trenton Canyon
(including)
297.2
310.9
13.7
6.11
Sulphide
Trenton Canyon
MRA7177
19.8
106.7
86.9
0.53
Oxide
Trenton Canyon
MRA7178
242.3
336.8
94.5
5.19
Sulphide
Trenton Canyon
(including)
245.4
253.0
7.6
44.68
Sulphide
Trenton Canyon
(including)
277.4
283.5
6.1
6.68
Sulphide
Trenton Canyon
MR7181
173.7
189.0
15.2
1.71
Oxide
Valmy
(including)
176.8
185.9
9.1
2.48
Oxide
Valmy
MR7184
195.1
213.4
18.3
1.60
Oxide
Valmy
Notes: Width in meters represents downhole intersected length, which may or may not be a true thickness of the mineralization. Drillholes presented in this table have gram-meter product greater than 20. "Width" may not equal the difference between "From" and "To" due to rounding.
Table 2. Collar locations from the exploration drill programs at the Marigold mine, Nevada, U.S. for the Exploration Period.
HOLE ID
UTM-N (Nad27 Zone11)
UTM-E (Nad27 Zone11)
Elevation (masl)
Azimuth (deg.)
Dip (deg.)
Length (meters)
Area
MRA6966
4504703
487645
1923
271
-65
419
Crossfire
MR6973
4503370
485884
1862
184
-90
367
East Basalt
MRA6980
4504770
487116
1855
270
-75
367
Valmy
MRA6981
4504770
487116
1855
269
-55
383
Valmy
MR6982
4505351
487292
1775
263
-90
367
Valmy
MRA6983
4505137
487300
1806
268
-50
361
Valmy
MR6984
4505046
487268
1819
111
-90
256
Valmy
MRA6985
4504244
487390
1912
268
-75
453
Valmy
MRA6986
4504244
487390
1912
273
-55
459
Valmy
MRA6987
4503407
485871
1850
269
-50
317
East Basalt
MRA6988
4503430
485879
1848
267
-55
277
East Basalt
MRA6989
4503397
485905
1861
90
-70
367
East Basalt
MRA6990
4503431
485924
1860
93
-75
367
East Basalt
MRA6991
4504921
487692
1823
270
-65
375
Crossfire
MRA6992
4504957
487590
1821
268
-65
459
Crossfire
MR6993
4503250
485948
1892
193
-90
398
East Basalt
MRA6994
4503250
485947
1892
272
-75
398
East Basalt
MRA6995
4503250
485946
1891
271
-60
276
East Basalt
MRA6996
4503220
485919
1881
88
-70
398
East Basalt
MR6997
4503281
485922
1884
99
-90
367
East Basalt
MRA6998
4503280
485925
1884
267
-70
367
East Basalt
MRA6999
4503280
485925
1884
269
-55
367
East Basalt
MRA7000
4503280
485924
1884
91
-75
367
East Basalt
MRA7001
4504860
487546
1860
273
-65
343
Crossfire
MRA7002
4504776
487734
1866
269
-65
358
Crossfire
MRA7003
4504801
487767
1856
267
-65
334
Crossfire
MRA7004
4504774
487785
1867
267
-65
343
Crossfire
MRA7006
4507743
485348
1615
82
-60
306
Mackay Pit
MRA7007
4507743
485348
1615
81
-78
322
Mackay Pit
MRA7008
4507572
485452
1615
89
-60
184
Mackay Pit
MRA7009
4507575
485449
1615
88
-45
184
Mackay Pit
MRA7010
4507697
485328
1614
89
-45
276
Mackay Pit
MRA7011
4507728
485359
1615
87
-50
276
Mackay Pit
MRA7012
4507743
485349
1615
81
-45
276
Mackay Pit
MRA7013
4507697
485329
1614
89
-60
306
Mackay Pit
MRA7014
4504795
487663
1881
264
-65
459
Crossfire
MR7015
4504735
487147
1854
354
-90
306
Valmy
MR7016
4504712
487145
1853
88
-90
337
Valmy
MRA7017
4504527
487083
1860
268
-50
367
Valmy
MRA7018
4504743
487662
1904
274
-65
459
Crossfire
MRA7019
4504698
487709
1906
274
-65
386
Crossfire
MRA7020
4504659
487765
1910
268
-65
459
Crossfire
MR7021
4504552
487219
1869
182
-90
361
Valmy
MR7022
4499322
484780
2262
286
-90
306
Trenton Canyon
MR7023
4503643
485978
1861
340
-90
386
East Basalt
MRA7024
4503706
485899
1860
267
-60
367
East Basalt
MRA7025
4503830
485876
1855
266
-60
367
East Basalt
MRA7026
4498956
485034
2251
272
-75
306
Trenton Canyon
DDH7027
4507272
484675
1601
92
-70
442
Red Dot
DDH7028
4507272
484704
1601
90
-68
416
Red Dot
DDH7029
4507271
484860
1589
87
-77
409
Red Dot
DDH7030
4507271
484951
1594
87
-75
404
Red Dot
DDH7031
4507271
484893
1593
90
-73
413
Red Dot
MRA7032
4507742
485346
1615
254
-85
337
Mackay Pit
MRA7033
4507742
485345
1615
267
-75
306
Mackay Pit
MR7034
4508241
485338
1432
107
-90
123
Mackay Pit
MR7035
4504920
487691
1823
155
-90
306
Crossfire
MRA7036
4504921
487690
1823
266
-45
349
Crossfire
MR7037
4507787
485396
1615
189
-90
306
Mackay Pit
MRA7038
4507787
485399
1615
87
-70
276
Mackay Pit
MRA7039
4505216
487594
1763
86
-85
306
Crossfire
MRA7040
4499171
484978
2262
270
-45
312
Trenton Canyon
MRA7041
4499171
484979
2262
273
-80
410
Trenton Canyon
MR7043
4505059
487714
1796
149
-90
306
Crossfire
MR7044
4505378
487641
1764
273
-90
184
Crossfire
MR7045
4505378
487578
1746
144
-90
154
Crossfire
MRA7046
4498437
485263
2190
263
-65
271
Trenton Canyon
MRA7047
4499108
484999
2263
270
-60
306
Trenton Canyon
MRA7048
4499137
484993
2262
273
-80
459
Trenton Canyon
DDH7049
4507269
484758
1589
94
-70
424
Red Dot
DDH7050
4507211
484833
1591
95
-67
421
Red Dot
DDH7051
4507242
484690
1602
91
-75
435
Red Dot
DDH7052
4507241
484832
1590
91
-70
442
Red Dot
MRA7053
4507696
485326
1614
89
-75
276
Mackay Pit
MRA7054
4499079
484968
2265
265
-60
312
Trenton Canyon
MRA7055
4499079
484968
2265
267
-45
309
Trenton Canyon
MRA7056
4499013
484878
2278
270
-75
306
Trenton Canyon
MRA7057
4499013
484877
2278
268
-50
306
Trenton Canyon
DDH7058
4507303
484675
1600
86
-70
282
Red Dot
DDH7059
4507301
484715
1600
96
-70
429
Red Dot
DDH7060
4507303
484771
1588
93
-70
427
Red Dot
DDH7061
4507302
484828
1588
87
-70
427
Red Dot
MRA7062
4506722
484969
1616
89
-75
433
DG80
MRA7063
4498950
484828
2287
270
-70
306
Trenton Canyon
MRA7064
4498951
484827
2287
271
-45
306
Trenton Canyon
MRA7065
4498928
484824
2289
272
-55
306
Trenton Canyon
MRA7066
4506570
484818
1609
92
-70
404
DG80
MR7067
4508256
487266
1537
90
-90
152
CELL23
MR7068
4508357
487132
1533
90
-90
152
CELL23
MR7069
4508515
486905
1534
90
-90
152
CELL23
MRA7070
4500506
483548
1981
88
-75
306
Trenton Canyon
MRA7071
4498469
485280
2195
270
-65
280
Trenton Canyon
MRA7072
4498497
485292
2198
274
-45
306
Trenton Canyon
MRA7073
4498497
485290
2199
278
-60
306
Trenton Canyon
MRA7074
4500633
483692
1984
91
-55
306
Trenton Canyon
MRA7075
4500353
483588
2033
88
-75
306
Trenton Canyon
MRA7076
4500561
483740
2030
89
-40
306
Trenton Canyon
MRA7077
4500410
483528
1997
78
-75
306
Trenton Canyon
MRA7078
4500563
483617
1986
93
-50
306
Trenton Canyon
MRA7079
4499682
483843
2202
81
-55
366
Trenton Canyon
MRA7080
4499682
483841
2202
83
-75
306
Trenton Canyon
MRA7081
4498687
485229
2222
271
-45
337
Trenton Canyon
MRA7082
4498716
485219
2224
274
-45
337
Trenton Canyon
MRA7083
4500531
483750
2046
90
-70
306
Trenton Canyon
MR7084
4500412
483647
2048
61
-90
306
Trenton Canyon
MRA7085
4499506
484457
2256
272
-70
306
Trenton Canyon
MRA7086
4500352
483680
2068
83
-45
306
Trenton Canyon
MRA7087
4499535
484467
2258
272
-70
306
Trenton Canyon
MRA7088
4500507
483758
2060
85
-68
306
Trenton Canyon
MRA7089
4499567
484486
2259
270
-75
306
Trenton Canyon
MRA7090
4499567
484485
2259
263
-55
306
Trenton Canyon
MRA7091
4500622
483591
1964
83
-75
306
Trenton Canyon
MRA7092
4499596
484508
2261
271
-50
306
Trenton Canyon
MRA7093
4500321
483650
2062
84
-45
306
Trenton Canyon
MRA7094
4500322
483578
2041
88
-75
337
Trenton Canyon
MR7095
4500506
483668
2026
75
-90
303
Trenton Canyon
MRA7096
4499629
484567
2263
272
-75
306
Trenton Canyon
MRA7097
4499260
484894
2262
274
-75
300
Trenton Canyon
MRA7098
4499260
484894
2262
267
-60
337
Trenton Canyon
MRA7099
4499260
484892
2262
268
-45
248
Trenton Canyon
MRA7100
4500449
483539
1991
83
-75
300
Trenton Canyon
MRA7101
4500538
483539
1971
79
-75
306
Trenton Canyon
MRA7102
4499136
484994
2263
273
-60
459
Trenton Canyon
MRA7103
4499137
484993
2262
272
-45
440
Trenton Canyon
MRA7104
4500321
483648
2062
94
-75
184
Trenton Canyon
MRA7105
4500321
483578
2041
93
-55
184
Trenton Canyon
MRA7106
4500352
483587
2034
80
-55
160
Trenton Canyon
MRA7107
4500356
483648
2054
81
-70
160
Trenton Canyon
MRA7108
4500412
483648
2048
88
-70
184
Trenton Canyon
MRA7109
4500380
483587
2026
94
-60
184
Trenton Canyon
MRA7110
4500383
483567
2017
91
-60
184
Trenton Canyon
MRA7111
4498467
485089
2177
264
-65
229
Trenton Canyon
MRA7113
4498408
485120
2178
266
-65
215
Trenton Canyon
MR7114
4498408
485121
2178
202
-90
215
Trenton Canyon
MRA7115
4498713
484955
2222
271
-45
312
Trenton Canyon
MRA7116
4498713
484955
2222
267
-85
306
Trenton Canyon
MRA7117
4500572
483554
1967
93
-80
306
Trenton Canyon
MRA7118
4500598
483560
1962
88
-80
306
Trenton Canyon
MRA7119
4499205
484946
2262
273
-75
306
Trenton Canyon
MRA7120
4499205
484946
2262
256
-60
459
Trenton Canyon
MRA7121
4499205
484946
2262
252
-45
459
Trenton Canyon
DDH7122
4500682
484393
2032
177
-80
1433
Trenton Canyon
MRA7123
4506510
484792
1611
82
-70
390
DG80
MRA7124
4506418
484915
1624
87
-60
413
DG80
MRA7125
4506418
485006
1632
86
-60
398
DG80
MRA7126
4499598
484508
2261
100
-65
325
Trenton Canyon
MRA7127
4499598
484509
2261
282
-75
355
Trenton Canyon
MR7128
4504465
487249
1876
30
-90
337
Valmy
MR7129
4504436
487255
1880
168
-90
337
Valmy
MR7130
4504434
487222
1878
145
-90
337
Valmy
MRA7131
4499598
484508
2261
278
-65
367
Trenton Canyon
MRA7132
4499627
484524
2262
262
-55
398
Trenton Canyon
MRA7133
4499627
484523
2262
267
-45
398
Trenton Canyon
MR7134
4504403
487260
1885
28
-90
367
Valmy
MRA7135
4499230
484928
2261
270
-60
337
Trenton Canyon
MRA7136
4499230
484928
2261
270
-45
337
Trenton Canyon
MR7137
4504435
487304
1881
136
-90
337
Valmy
MR7138
4504437
487185
1877
132
-90
337
Valmy
MR7139
4504251
487434
1910
207
-90
337
Valmy
MRA7140
4504223
487485
1919
272
-70
378
Valmy
MRA7141
4499019
485016
2259
270
-70
306
Trenton Canyon
MRA7142
4499048
485008
2261
267
-55
306
Trenton Canyon
MRA7143
4499561
484476
2258
271
-45
367
Trenton Canyon
MR7144
4504250
487476
1915
152
-90
352
Valmy
MR7145
4499786
484394
2152
101
-90
337
Trenton Canyon
MR7146
4499750
484363
2155
1
-90
337
Trenton Canyon
MRA7147
4499507
484452
2256
265
-55
340
Trenton Canyon
MRA7148
4499261
484897
2261
79
-85
337
Trenton Canyon
MR7149
4499629
484564
2262
346
-90
367
Trenton Canyon
MRA7150
4499538
484467
2257
268
-45
352
Trenton Canyon
MRA7151
4506631
484763
1607
89
-70
428
DG80
MRA7152
4499595
484494
2260
273
-42
178
Trenton Canyon
MRA7153
4506602
484757
1608
93
-70
413
DG80
MRA7154
4499142
483924
2295
78
-45
337
Trenton Canyon
MRA7155
4499385
483931
2296
83
-45
337
Trenton Canyon
MRA7156
4499356
483917
2296
84
-65
337
Trenton Canyon
MRA7157
4499356
483918
2296
84
-45
337
Trenton Canyon
MRA7158
4506606
484811
1608
92
-70
337
DG80
MRA7159
4499963
484236
2107
269
-55
276
Trenton Canyon
MRA7160
4500054
484183
2097
272
-65
276
Trenton Canyon
MRA7161
4500054
484181
2097
271
-45
201
Trenton Canyon
MRA7162
4506084
484971
1640
90
-60
337
DG80
MRA7163
4506204
485034
1636
92
-60
337
DG80
MRA7164
4506204
484953
1638
92
-60
337
DG80
MRA7165
4499800
483845
2200
89
-45
306
Trenton Canyon
MRA7166
4499109
485001
2263
268
-75
306
Trenton Canyon
MRA7167
4499079
484970
2264
269
-80
306
Trenton Canyon
MRA7168
4506327
485019
1634
87
-60
337
DG80
MRA7169
4506339
484849
1615
91
-60
245
DG80
MRA7170
4506209
484823
1618
88
-60
373
DG80
MRA7171
4499048
485009
2261
270
-70
306
Trenton Canyon
MRA7172
4499018
485016
2259
273
-85
306
Trenton Canyon
MRA7173
4499018
485014
2259
273
-50
302
Trenton Canyon
MR7174
4504620
487182
1861
101
-90
337
Valmy
MR7175
4504556
487261
1878
166
-90
306
Valmy
MRA7176
4499262
484898
2261
85
-75
369
Trenton Canyon
MRA7177
4499292
484824
2264
90
-70
398
Trenton Canyon
MRA7178
4499291
484826
2262
91
-80
337
Trenton Canyon
MR7180
4504494
487234
1870
352
-90
337
Valmy
MR7181
4504407
487187
1888
240
-90
337
Valmy
MR7183
4504342
487199
1908
105
-90
367
Valmy
MR7184
4504346
487272
1899
324
-90
337
Valmy
MR7185
4504344
487349
1895
270
-90
337
Valmy
MRA7194
4504279
487455
1913
268
-70
410
Valmy
MRA7195
4504285
487555
1936
268
-70
398
Valmy
MR7196
4504440
486685
1903
90
-90
337
Valmy
MRA7198
4504497
486568
1887
270
-50
306
Valmy
MRA7199
4504496
486669
1901
270
-50
306
Valmy
MRA7200
4504527
486591
1893
270
-50
337
Valmy
MRA7201
4504587
486821
1891
270
-50
337
Valmy
Notes: The numerical gaps in the drillhole sequence result from drillholes reported previously or drillholes expected to be drilled in 2020.
Table 3. Selected drillhole results from Seabee Gold Operation, Saskatchewan, Canada for the Exploration Period.
Hole ID
From (meters)
To (meters)
Mine E (midpoint)1
Mine N (midpoint)1
Elevation (midpoint)1
True Width (meters)
Gold (g/t)2
Zone
JOY-19-904
60.7
70.0
4514.7
5121.0
-64.57
3.79
6.06
Gap HW
JOY-19-909
46.4
54.5
4483.0
5044.3
-39.24
7.65
4.31
Gap HW
SUG-19-014
247.0
251.0
4375.6
5195.5
-217.05
1.45
11.82
Gap HW
SUG-19-015
156.8
162.8
4460.6
5172.2
-138.47
4.22
4.15
Gap HW
SUG-19-017
179.5
184.5
4437.5
5179.3
-155.05
3.83
8.69
Gap HW
SUG-19-019
168.8
187.8
4477.0
5201.7
-93.6
16.31
5.97
Gap HW
SUG-19-021
143.0
148.0
4465.9
5143.7
-118.94
3.49
9.72
Gap HW
SUG-19-022
177.5
184.5
4428.2
5161.9
-161.21
3.62
11.00
Gap HW
SUG-19-603X
450.0
480.0
4060.2
5511.9
-489.58
2.88
3.71
Gap HW
SUG-19-024
315.7
323.0
4300.7
5193.7
-235.66
3.44
3.27
Gap HW
SUG-19-025
369.6
372.5
4260.8
5204.9
-279.19
1.14
28.81
Gap HW
and
378.0
380.5
4253.5
5207.9
-281.39
1.00
21.36
Gap HW
SUG-19-026
127.3
133.5
4481.6
5127.5
-106.34
5.62
8.14
Gap HW
SUG-19-028
234.5
244.0
4355.0
5117.5
-181.52
5.00
10.99
Gap HW
SUG-19-029
291.6
299.2
4304.5
5137.8
-208.94
3.47
10.45
Gap HW
SUG-19-034
346.5
351.5
4465.9
5368.4
-316.41
2.84
10.89
Gap HW
SUG-19-615
410.1
415.0
3911.0
5357.1
-592.88
2.33
29.74
Gap HW
SUG-19-038
216.5
220.5
4564.3
5290.3
-228.94
3.26
3.36
Gap HW
SUG-19-041
415.5
423.0
4396.8
5383.5
-377.03
2.95
21.36
Gap HW
SUG-19-042
370.8
378.5
4443.1
5380.0
-335.73
3.31
4.73
Gap HW
SUG-19-043
415.9
423.5
4454.1
5413.8
-370.2
6.25
9.37
Gap HW
SUG-19-948
155.7
166.7
4105.2
5411.6
-439.46
5.25
5.11
Gap HW
SUG-19-950
77.5
84.5
4159.5
5344.1
-421.79
3.78
6.30
Gap HW
SUG-19-952
99.4
106.5
4112.6
5318.7
-440.19
5.11
5.02
Gap HW
SUG-19-953
106.3
116.0
4103.2
5319.5
-453.71
6.08
4.24
Gap HW
and
116.0
126.0
4093.7
5322.0
-453.38
6.27
5.02
Gap HW
SUG-19-954
127.9
135.0
4084.6
5325.0
-471.1
4.72
6.58
Gap HW
and
135.0
141.6
4078.1
5326.9
-471.8
4.39
13.50
Gap HW
SUG-19-921
236.2
244.2
4432.3
5192.7
-508.71
4.39
6.64
Santoy 8A
SUG-19-923
274.4
279.3
4473.3
5193.7
-504.65
2.62
29.87
Santoy 8A
SUG-19-924
237.6
246.7
4436.9
5218.9
-531.97
5.00
12.37
Santoy 8A
SUG-19-928
311.7
323.6
4513.7
5178.3
-489.83
5.83
19.81
Santoy 8A
SUG-19-931
217.5
223.5
4294.0
5083.9
-407.71
3.48
4.47
Santoy 8A
SUG-19-932
193.6
201.7
4288.6
5103.7
-430.31
5.57
8.90
Santoy 8A
SUG-19-933
209.7
219.0
4319.7
5100.1
-420.11
5.25
20.56
Santoy 8A
SUG-19-935
290.3
292.1
4362.0
5046.0
-372.81
0.79
34.15
Santoy 8A
SUG-19-936
231.9
235.0
4353.0
5101.0
-411.02
1.65
6.65
Santoy 8A
SUG-19-937
221.4
225.7
4302.0
5083.8
-408.93
2.54
17.78
Santoy 8A
SUG-19-945
346.2
349.8
4526.4
5337.3
-606.88
1.03
21.62
Santoy 8A
SUG-19-304
19.6
21.9
3891.8
4852.5
-230.58
2.23
5.96
Santoy 9C
SUG-19-306
49.8
57.2
4308.3
5072.2
-396.18
7.06
4.11
Santoy 8A
SUG-19-307
52.0
58.6
4325.0
5085.1
-404.72
6.23
20.14
Santoy 8A
SUG-19-308
53.7
55.9
4327.9
5097.1
-395.53
2.17
10.35
Santoy 8A
SUG-19-310
58.6
60.8
4353.3
5082.1
-396.76
1.93
21.45
Santoy 8A
SUG-19-312
10.7
13.9
3680.0
4989.0
-446.84
1.97
24.00
Santoy 9B
SUG-19-314
12.0
14.5
3693.0
4988.0
-447.85
1.54
15.28
Santoy 9B
SUG-19-316
19.2
22.3
3705.2
4985.5
-455.33
1.94
5.29
Santoy 9B
SUG-20-300
42.0
43.2
3879.9
4782.3
-179.0
0.73
28.67
Santoy 9A
SUG-20-302
26.2
28.1
3891.7
4796.4
-191.2
1.57
21.04
Santoy 9A
SUG-20-309
75.7
87.8
4420.7
5238.7
-557.6
6.87
3.61
Santoy 8A
SUG-20-902
114.2
121.8
4103.2
5339.9
-453.1
4.78
5.71
Gap HW
SUG-20-904
66.5
72.9
4153.6
5326.0
-435.6
4.96
3.02
Gap HW
and
91.9
97.0
4133.9
5338.8
-428.1
3.95
3.17
Gap HW
SUG-20-905
61.8
68.8
4166.2
5325.6
-422.3
5.94
3.38
Gap HW
and
72.6
75.3
4160.5
5330.4
-417.8
2.29
7.70
Gap HW
SUG-20-906
135.9
147.0
4103.7
5378.8
-426.2
7.31
7.61
Gap HW
SUG-20-004
341.7
347.7
4559.2
5342.7
-388.4
3.59
3.19
Gap HW
SUG-20-907
96.2
101.4
4132.1
5350.9
-453.2
2.97
13.15
Gap HW
SUG-20-908
115.5
126.4
4115.6
5364.8
-466.6
4.79
13.72
Gap HW
SUG-20-911
87.5
96.4
4124.7
5299.4
-423.4
7.64
14.75
Gap HW
SUG-20-912
96.2
100.0
4114.1
5298.4
-439.2
3.00
7.08
Gap HW
and
106.0
110.0
4104.4
5299.3
-437.4
3.16
6.01
Gap HW
SUG-20-914
156.6
161.6
4052.7
5298.1
-474.2
2.12
5.34
Gap HW
SUG-20-915
83.2
86.5
4137.8
5299.2
-412.4
3.20
4.94
Gap HW
SUG-20-918
151.4
155.5
4067.3
5329.2
-495.0
1.59
6.47
Gap HW
and
170.0
178.8
4047.8
5334.4
-500.4
3.42
4.64
Gap HW
SUG-20-919
205.1
210.0
4026.9
5353.7
-528.7
1.44
22.26
Gap HW
JOY-20-914
769.0
771.9
3794.0
5544.6
-749.8
2.62
28.92
Gap HW
JOY-20-915
671.0
675.3
3823.7
5604.5
-637.6
3.18
3.55
Gap HW
BAT-20-013 3
31.7
35.3
600432.2
6168877.9
421
3.60
37.95
Joker
(including) 3
31.7
32.7
600432.8
6168878.0
422
1.00
117.20
Joker
FIS-20-042 3
94.5
96.0
601189.4
6166972.6
377
1.50
12.13
Abel Lake
FIS-20-041 3
472.1
472.6
603806.6
6161408.8
5
0.50
20.54
Mac North
FIS-20-053 3
253.6
255.6
603775.6
6161382.4
260
1.92
9.10
Mac North
(including) 3
255.1
255.6
603775.6
6161382.4
260
0.50
25.14
Mac North
YIN-20-004 3
98.1
100.4
601523.4
6166917.0
371
2.29
13.74
Yin
(including) 3
99.9
100.4
601523.9
6166917.0
370
0.53
55.50
Yin
Notes: Drillholes presented in this table have gram-meter product greater than 9. For the Joker, Abel Lake, Mac North and Yin areas, width in meters represents downhole intersected length, which may or may not be a true thickness of the mineralization. 1 Midpoints of the intercept determined where mineralized structure intersected. 2 Gold values cut to 75 g/t. 3 Coordinates in UTM NAD83 Zone 13 Datum.
Sampling and Analytical Procedures
Drill samples in respect of the Marigold mine drilling program were sent for processing and analysis to the offices of American Assay Laboratories, Inc. ("AAL") in Sparks, Nevada which is an ISO 17025 accredited laboratory independent from SSR Mining. Fire assay was completed on a 30-gram sample (AAL method code FA-PB30-ICP) with an Inductively Coupled Plasma finish after a two-acid digestion. Samples with assay results greater than 10 g/t gold were fire assayed on a 30-gram sample (AAL method code Grav Au30) with a gravimetric finish. We employ a rigorous Quality Assurance/Quality Control ("QA/QC") program, which includes real-time assay quality monitoring through the regular insertion of blanks, duplicates, and certified reference material, as well as reviewing laboratory-provided QA/QC data.
Marigold mine also utilizes Paragon Geochemical Laboratories, a privately held corporation located in Sparks, Nevada. Analytical procedures utilized are ISO/IEC 17025:2017 accredited and ISO 9001:2015 certified. Samples were prepared under strictly controlled processes, and 30-gram aliquots fire assayed with lead collection. The analytical determinations were with aqua regia digestion and Inductively Coupled Plasma analysis (Au-OES30). Results greater than 8 g/t gold were fire assayed with gravimetric finish (Au-GR30). Quality control utilizes layers of embedded controls that are monitored during operations and used for final certification.
All drill samples in respect of the Seabee Gold Operation ("SGO") underground drilling program and some samples from the surface program were assayed by our onsite non-accredited assay laboratory, which is not independent from SSR Mining. Surface drilling samples not analyzed by our onsite assay laboratory were analyzed at TSL Laboratories Inc. ("TSL") in Saskatoon, Saskatchewan, which also serves as the QAQC laboratory for our onsite lab. Duplicate check assays were conducted at site as well as at TSL, which is independent from SSR Mining. Results of the spot checks were consistent with those reported. Sampling interval was established by minimum or maximum sampling lengths and geological and/or structural criteria. SGO site lab typically prepares two hundred-gram samples that were pulverized until greater than 80 percent passed through a 150-mesh screen. Thirty-gram pulp samples were then analyzed for gold by fire assay with gravimetric finish (0.01 g/t gold detection limit). TSL prepares a minus150 mesh pulp (95% passing) weighing 250 grams from a minus 10 mesh coarse crush reject. Fire assay with Atomic Absorption finish was completed on a 30-gram aliquot to produce gold analytical results with a 0.005 g/t gold detection limit. Fire assay with gravimetric finish was prepared on those samples with greater than 3 g/t gold.
Qualified Persons
The scientific and technical data contained in this news release relating to the Marigold mine has been reviewed and approved by James N. Carver, SME Registered Member and a qualified person under National Instrument 43-101 — Standards of Disclosure for Mineral Projects ("NI 43-101"). Mr. Carver is our Exploration Manager at the Marigold mine. The scientific and technical data contained in this news release relating to the Seabee Gold Operation has been reviewed and approved by Jeffrey Kulas, P. Geo., a qualified person under NI 43-101. Mr. Kulas is our Manager Geology, Mining Operations at the Seabee Gold Operation. The scientific and technical data contained in this news release relating to the Puna Operations has been reviewed and approved by F. Carl Edmunds, P. Geo., a qualified person under NI 43-101. Mr. Edmunds is our Vice President, Exploration. The qualified persons have verified the information disclosed herein, including the sampling, preparation, security and analytical procedures underlying such information, and are not aware of any significant risks and uncertainties that could be expected to affect the reliability or confidence in the information discussed herein.
About SSR Mining
SSR Mining Inc. is a Canadian-based precious metals producer with three operations, including the Marigold gold mine in Nevada, U.S., the Seabee Gold Operation in Saskatchewan, Canada and Puna Operations in Jujuy, Argentina. We also have two feasibility stage projects and a portfolio of exploration properties in North and South America. We are committed to delivering safe production through relentless emphasis on Operational Excellence. We are also focused on growing production and Mineral Reserves through the exploration and acquisition of assets for accretive growth, while maintaining financial strength.
For further information contact: W. John DeCooman, Jr. Senior Vice President, Business Development and Strategy SSR Mining Inc. Vancouver, BC Toll free: +1 (888) 338-0046 All others: +1 (604) 689-3846 E-Mail: [email protected]
To receive SSR Mining's news releases by e-mail, please register using the SSR Mining website at www.ssrmining.com.
This news release contains forward-looking information within the meaning of Canadian securities laws and forward-looking statements within the meaning of the U.S. Private Securities Litigation Reform Act of 1995 (collectively, "forward-looking statements") concerning the anticipated developments in our operations in future periods, and other events or conditions that may occur or exist in the future. All statements, other than statements of historical fact, are forward-looking statements.
Generally, forward-looking statements can be identified by the use of words or phrases such as "expects," "anticipates," "plans," "projects," "estimates," "assumes," "intends," "strategy," "goals," "objectives," "potential," or variations thereof, or stating that certain actions, events or results "may," "could," "would," "might" or "will" be taken, occur or be achieved, or the negative of any of these terms or similar expressions. The forward-looking statements in this news release relate to, among other things: our ability to discover and increase Mineral Resources at the Marigold mine and the Seabee Gold Operation, including (a) increasing Mineral Resources at Trenton Canyon and Valmy at year-end 2020 and (b) increasing Mineral Resources at Santoy Gap HW and Santoy 9A at year-end 2020; expected timing for our exploration program at the Trenton Canyon property in the second quarter of 2020; our expected drill programs at each of the Marigold mine and the Seabee Gold Operation; estimated mine life, including anticipated extension of the mine life of the Marigold mine and the Seabee Gold Operation; estimated project economics; the impact of the COVID-19 outbreak on our mining operations and exploration programs, including the suspension of operations at the Seabee Gold Operation and Puna Operations and the implementation of a safe restart plan at the Seabee Gold Operation; the timing, focus and results of our exploration and development programs, including our ability to achieve certain exploration objectives depending on the duration of the suspension at the Seabee Gold Operation; the Marigold mine continuing to operate with limited impact from COVID-19, including exploration activities at the Marigold mine continuing as planned; future production of gold, silver and other metals; estimated production rates for gold, silver and other metals produced by us; ongoing or future development plans and capital replacement, improvement or remediation programs; and our plans and expectations for our properties and operations.
These forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied, including, without limitation, the following: uncertainty of production, development plans and cost estimates for the Marigold mine, the Seabee Gold Operation, Puna Operations and our projects, including as a result of COVID-19; the duration of the suspension of operations at the Seabee Gold Operation and Puna Operations, and the development and implementation of plans to resume operations; disruptions to our supply chain, customers and workforce due to the COVID-19 outbreak; the responses of the relevant governments to the COVID-19 outbreak not being sufficient to contain the impact of the COVID-19 outbreak; an economic recession or downturn as a result of the COVID-19 outbreak that materially adversely affects our operations or liquidity position; our ability to replace Mineral Reserves; commodity price fluctuations; political or economic instability and unexpected regulatory changes; currency fluctuations; the possibility of future losses; general economic conditions; counterparty and market risks related to the sale of our concentrates and metals; uncertainty in the accuracy of Mineral Reserves and Mineral Resources estimates and in our ability to extract mineralization profitably; differences in U.S. and Canadian practices for reporting Mineral Reserves and Mineral Resources; lack of suitable infrastructure or damage to existing infrastructure; future development risks, including start-up delays and cost overruns; our ability to obtain adequate financing for further exploration and development programs and opportunities; uncertainty in acquiring additional commercially mineable mineral rights; delays in obtaining or failure to obtain governmental permits, or non-compliance with our permits; our ability to attract and retain qualified personnel and management; the impact of governmental regulations, including health, safety and environmental regulations, including increased costs and restrictions on operations due to compliance with such regulations; unpredictable risks and hazards related to the development and operation of a mine or mineral property that are beyond our control; reclamation and closure requirements for our mineral properties; potential labour unrest, including labour actions by our unionized employees at Puna Operations; indigenous peoples' title claims and rights to consultation and accommodation may affect our existing operations as well as development projects and future acquisitions; certain transportation risks that could have a negative impact on our ability to operate; assessments by taxation authorities in multiple jurisdictions; recoverability of value added tax and Puna credits balance and significant delays in the collection process in Argentina; claims and legal proceedings, including adverse rulings in litigation against us and/or our directors or officers; compliance with anti-corruption laws and internal controls, and increased regulatory compliance costs; complying with emerging climate change regulations and the impact of climate change; fully realizing our interest in deferred consideration received in connection with recent divestitures; fully realizing the value of our shareholdings in our marketable securities, due to changes in price, liquidity or disposal cost of such marketable securities; uncertainties related to title to our mineral properties and the ability to obtain surface rights; the sufficiency of our insurance coverage; civil disobedience in the countries where our mineral properties are located; operational safety and security risks; actions required to be taken by us under human rights law; competition in the mining industry for mineral properties; our ability to complete and successfully integrate an announced acquisition; reputation loss resulting in decreased investor confidence; increased challenges in developing and maintaining community relations and an impediment to our overall ability to advance our projects; risks normally associated with the conduct of joint ventures; an event of default under our 2013 convertible notes or our 2019 convertible notes may significantly reduce our liquidity and adversely affect our business; failure to meet covenants under our senior secured revolving credit facility; information systems security threats; conflicts of interest that could arise from certain of our directors' and officers' involvement with other natural resource companies; other risks related to our common shares; and those other various risks and uncertainties identified under the heading "Risk Factors" in our most recent Annual Information Form filed with the Canadian securities regulatory authorities and included in our most recent Annual Report on Form 40-F filed with the U.S. Securities and Exchange Commission ("SEC").
This list is not exhaustive of the factors that may affect any of our forward-looking statements. Our forward-looking statements are based on what our management currently considers to be reasonable assumptions, beliefs, expectations and opinions based on the information currently available to it. Assumptions have been made regarding, among other things: our ability to carry on our exploration and development activities; our ability to meet our obligations under our property agreements; the timing and results of drilling programs; the discovery of Mineral Resources and Mineral Reserves on our mineral properties; the timely receipt of required approvals and permits, including those approvals and permits required for successful project permitting, construction and operation of our projects; the price of the minerals we produce; the costs of operating and exploration expenditures; our ability to operate in a safe, efficient and effective manner; our ability to obtain financing as and when required and on reasonable terms; our ability to continue operating the Marigold mine and the Seabee Gold Operation; dilution and mining recovery assumptions; the success of mining, processing, exploration and development activities; the accuracy of geological, mining and metallurgical estimates; no significant unanticipated operational or technical difficulties; maintaining good relations with the communities surrounding the Marigold mine and the Seabee Gold Operation; no significant events or changes relating to regulatory, environmental, health and safety matters; certain tax matters; and no significant and continuing adverse changes in general economic conditions or conditions in the financial markets (including commodity prices, foreign exchange rates and inflation rates). You are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. We cannot assure you that actual events, performance or results will be consistent with these forward-looking statements, and management's assumptions may prove to be incorrect. Our forward-looking statements reflect current expectations regarding future events and operating performance and speak only as of the date hereof and we do not assume any obligation to update forward-looking statements if circumstances or management's beliefs, expectations or opinions should change other than as required by applicable law. For the reasons set forth above, you should not place undue reliance on forward-looking statements.
Cautionary Note to U.S. Investors
This news release includes Mineral Reserves and Mineral Resources classification terms that comply with reporting standards in Canada and the Mineral Reserves and the Mineral Resources estimates are made in accordance with NI 43-101. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. These standards differ significantly from the requirements of the SEC set out in SEC Industry Guide 7. Consequently, Mineral Reserves and Mineral Resources information included in this news release is not comparable to similar information that would generally be disclosed by domestic U.S. reporting companies subject to the reporting and disclosure requirements of the SEC. Under SEC standards, mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be economically produced or extracted at the time the reserve determination is made. In addition, the SEC's disclosure standards normally do not permit the inclusion of information concerning "Measured Mineral Resources," "Indicated Mineral Resources" or "Inferred Mineral Resources" or other descriptions of the amount of mineralization in mineral deposits that do not constitute "reserves" by U.S. standards in documents filed with the SEC. U.S. investors should understand that "Inferred Mineral Resources" have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. Moreover, the requirements of NI 43-101 for identification of "reserves" are also not the same as those of the SEC, and reserves reported by us in compliance with NI 43-101 may not qualify as "reserves" under SEC standards. Accordingly, information concerning mineral deposits set forth herein may not be comparable with information made public by companies that report in accordance with U.S. standards.
Share this article