TORONTO, Feb. 9, 2012 /CNW/ - A 30 year-old transformer is prepped for replacement in front of Union Station. A Toronto Hydro crew including, Tim O'Sullivan (right), installed a much needed new transformer powering part of the downtown core. This project is part of Toronto Hydro's long-term plan to replace the 29% of its assets that are past their useful life.
Image with caption: "A 30 year-old transformer is prepped for replacement in front of Union Station. A Toronto Hydro crew including, Tim O'Sullivan (right), installed a much needed new transformer powering part of the downtown core. This project is part of Toronto Hydro's long-term plan to replace the 29% of its assets that are past their useful life. (CNW Group/Toronto Hydro Corporation)". Image available at: http://photos.newswire.ca/images/download/20120209_C3021_PHOTO_EN_9978.jpg
Toronto Hydro Corporation is a holding company which wholly owns two subsidiaries: Toronto Hydro-Electric System Limited (THESL) – distributes electricity; and Toronto Hydro Energy Services Inc. – provides streetlighting and expressway lighting services in the city of...
Also from this source
Share this article