Vision Lithium Reports Results from Sirmac Drill Program
VAL-D'OR, QC, July 19, 2018 /CNW/ - Vision Lithium Inc. (TSXV: VLI) (OTC: ABEPF) (the "Company" or "VLI") is pleased to announce the results from its 1,584 metre drilling program targeting the #5 Dyke outcrop and surrounding area. The Sirmac lithium property, acquired from Nemaska Lithium Inc. ("Nemaska"), consists of 194 mining claims having a total area of approximately 10,350 hectares, and is located 180 kilometres by road north-west of Chibougamau, Quebec.
Results include:
DDH |
Zone |
From |
To |
Core |
Li2O |
Ta2O5 |
SIR-12-26-Twin* |
Dyke no. 5 |
2.4 |
22.2 |
19.8 |
1.62 |
59.7 |
SIR-12-45-Twin |
Dyke no. 5 |
13.7 |
19.7 |
6.0 |
1.22 |
63.6 |
SIR-12-49-Twin |
Dyke no. 5 |
30.1 |
42.1 |
12.0 |
1.22 |
79.2 |
SIR-12-61-Twin |
Dyke no. 5 |
4.7 |
10.7 |
6.0 |
1.30 |
47.2 |
SIR-12-61-Twin |
Dyke no. 5 |
25.9 |
42.0 |
16.1 |
0.25 |
114.3 |
SIR-12-63-Twin |
Dyke no. 5 |
13.6 |
22.6 |
9.0 |
1.40 |
38.8 |
SIR-18-02* |
Dyke no. 5 |
1.6 |
24.0 |
22.4 |
1.70 |
57.4 |
SIR-18-04 |
Dyke no. 5 |
22.5 |
37.2 |
14.7 |
1.42 |
74.1 |
SIR-18-05 |
Dyke no. 5 |
3.6 |
5.1 |
1.5 |
1.43 |
16.0 |
SIR-18-21 |
Dyke no. 5 |
22.4 |
24.8 |
2.4 |
0.57 |
41.1 |
*: Previously reported
"This short drill program is our first work since acquiring the Sirmac property and was done in winter conditions. Holes drilled on the No.5 Dyke were successful in replicating past results and extending the dyke to the north, and will also provide material for new metallurgical tests later this summer. We will follow up on this work with a summer exploration program to better understand the main dyke geometry ahead of renewed drilling later this year. The bulk of the recent drilling was however done outside the main dyke zone where we intersected multiple narrow pegmatites which appear to be LCT dykes. As we advance the main dyke zone, we want to evaluate these and other targets on the property which show potential for Lithium mineralization," said Yves Rougerie, President and CEO of Vision Lithium.
Drill hole collar information:
Project |
HOLE |
Azimuth |
Dip |
Length |
UTM Nad 83 - East |
UTM Nad 83 - North |
UTM Nad 83 - Elevation |
Sirmac |
SIR-12-26-Twin |
55 |
-59 |
51 |
466312 |
5607927 |
387 |
Sirmac |
SIR-12-45-Twin |
182 |
-49 |
51 |
466246 |
5608046 |
376 |
Sirmac |
SIR-12-49-Twin |
- |
-90 |
51 |
466248 |
5608072 |
373 |
Sirmac |
SIR-12-61-Twin |
- |
-90 |
51 |
466204 |
5608149 |
368 |
Sirmac |
SIR-12-63-Twin |
264 |
-46 |
51 |
466374 |
5608193 |
369 |
Sirmac |
SIR-18-01 |
- |
-90 |
51 |
466284 |
5607990 |
380 |
Sirmac |
SIR-18-02 |
360 |
-87 |
51 |
466350 |
5607872 |
397 |
Sirmac |
SIR-18-03 |
235 |
-45 |
72 |
466390 |
5607878 |
394 |
Sirmac |
SIR-18-04 |
235 |
-45 |
72 |
466393 |
5607854 |
398 |
Sirmac |
SIR-18-05 |
235 |
-45 |
51 |
466417 |
5607800 |
405 |
Sirmac |
SIR-18-06 |
- |
-90 |
51 |
466123 |
5608100 |
366 |
Sirmac |
SIR-18-07 |
- |
-90 |
51 |
466155 |
5608048 |
373 |
Sirmac |
SIR-18-08 |
- |
-90 |
51 |
466178 |
5608004 |
371 |
Sirmac |
SIR-18-09 |
- |
-90 |
51 |
466305 |
5608178 |
371 |
Sirmac |
SIR-18-10 |
- |
-90 |
51 |
466315 |
5608126 |
373 |
Sirmac |
SIR-18-11 |
- |
-90 |
51 |
466350 |
5608075 |
370 |
Sirmac |
SIR-18-12S |
- |
-90 |
75 |
466418 |
5608029 |
390 |
Sirmac |
SIR-18-13S |
- |
-90 |
75 |
466496 |
5607953 |
390 |
Sirmac |
SIR-18-14S |
- |
-90 |
75 |
466563 |
5607885 |
390 |
Sirmac |
SIR-18-15S |
- |
-90 |
78 |
466632 |
5607816 |
390 |
Sirmac |
SIR-18-16S |
- |
-90 |
75 |
466736 |
5608135 |
390 |
Sirmac |
SIR-18-17 |
- |
-90 |
102 |
466723 |
5607605 |
381 |
Sirmac |
SIR-18-18S |
- |
-90 |
75 |
466838 |
5608034 |
390 |
Sirmac |
SIR-18-19 |
- |
-90 |
54 |
466442 |
5607755 |
410 |
Sirmac |
SIR-18-20 |
360 |
-45 |
66 |
466326 |
5607812 |
400 |
Sirmac |
SIR-18-21 |
- |
-90 |
51 |
466192 |
5608046 |
367 |
The information of scientific or technical information in this release has been reviewed and approved by Yves Rougerie, geo, President and CEO of the Company. Mr. Rougerie is a qualified person as defined by NI 43-101.
All rock samples were sent for preparation and analysis to the ALS Chemex laboratory in Val-d'Or, Quebec. Core samples were sawed in half, with one half being bagged and tagged using barcodes. The samples are typically 1.5 metre samples. The samples were transported to Val d'Or by secure transport and delivered to ALS Chemex. Vision Lithium Inc. applies a rigorous quality control protocol, including the insertion of certified analytical standards, duplicates and blanks and statistical follow-up of the results.
About Vision Lithium Inc.
Vision Lithium Inc. is a junior exploration company focused on exploring and developing high quality battery mineral assets including lithium and copper in safe jurisdictions, primarily Canada. The Company is led by skilled and qualified mineral exploration experts and business professionals with a deep understanding of the lithium battery materials market which is driven by lithium ion batteries. Vision Lithium is committed to discovering new world class assets and bringing these assets to production, starting with its flagship projects the Sirmac Lithium property and the Dome Lemieux copper property, both located in Quebec, Canada. Nemaska Lithium is the largest shareholder of Vision Lithium.
For further information on the Company, please visit our website at www.visionlithium.com or contact us at [email protected].
NEITHER THE TSXV NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSXV) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.
SOURCE Vision Lithium Inc.
Victor Cantore, Executive Chairman, Tel: +1 514 831 3809, Email: [email protected]; Yves Rougerie, President and CEO, Tel: +1 819 316 0474, Email: [email protected]
Share this article